Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Tennessee |
---|---|
Assessment Year | 1996 |
Principal Product | Uniform pants and outerwear |
NAICS | n/a |
SIC | 2311 - Men's and Boys' Suits, Coats, and Overcoats |
Sales | $50,000,000-$100,000,000 |
# of Employees | 425 |
Plant Area (Sq.Ft.) | 185,000 |
Annual Production | 28,109,250 Pieces |
Production Hrs. Annual | 3,557 |
Location (State) | TN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $268,873 | 4,497,069 | kWh | $0.06 |
Electricity Demand | $130,841 | 14,308 | kW-months/year | $9.14 |
Natural Gas | $52,147 | 10,252 | MMBtu | $5.09 |
TOTAL ENERGY COSTS | $1,410,155 | |||
RECOMMENDED SAVINGS* | $169,049 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $18,156 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | By-product Production | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | By-product Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $149,480 Cost: $150,000 |
- | - | - | - | - | - | $12,480 | 270,000 | $(-25,000) | - | $162,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$12,480 270,000 lb |
$(-25,000) - $ |
$162,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER |
Savings: $13,909 Cost: $15,800 |
- | - | $13,909 | 1,428 | - | - | - | - | - | - | - | - |
- - kWh |
$13,909 1,428 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
Savings: $1,987 Cost: - |
$1,987 | 33,118 | - | - | - | - | - | - | - | - | - | - |
$1,987 33,118 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $1,413 Cost: - |
$712 | 23,740 | $701 | 72 | - | - | - | - | - | - | - | - |
$712 23,740 kWh |
$701 72 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,469 Cost: $1,548 |
- | - | - | - | $1,469 | 288 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,469 288 MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES |
Savings: $454 Cost: $472 |
- | - | - | - | $454 | 89 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$454 89 MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $337 Cost: $286 |
- | - | - | - | $337 | 66 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$337 66 MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $169,049 Cost: $168,106 |
$2,699 | 56,858 | $14,610 | 1,500 | $2,260 | 443 | $12,480 | 270,000 | $(-25,000) | - | $162,000 | - | $2,699 56,858 kWh |
$14,610 1,500 kW-months/year |
$2,260 443 MMBtu |
$12,480 270,000 lb |
$(-25,000) - $ |
$162,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $18,156 Cost: $18,106 |
$1,987 | 33,118 | $13,909 | 1,428 | $2,260 | 443 | - | - | - | - | - | - | $1,987 33,118 kWh |
$13,909 1,428 kW-months/year |
$2,260 443 MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | By-product Production | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | By-product Production |