IAC Assessment: TN0572
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0572
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1996
Principal Product Uniform pants and outerwear
NAICS n/a
SIC 2311 - Men's and Boys' Suits, Coats, and Overcoats
Sales $50,000,000-$100,000,000
# of Employees 425
Plant Area (Sq.Ft.) 185,000
Annual Production 28,109,250 Pieces
Production Hrs. Annual 3,557
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $268,873 4,497,069 kWh $0.06
Electricity Demand $130,841 14,308 kW-months/year $9.14
Natural Gas $52,147 10,252 MMBtu $5.09
TOTAL ENERGY COSTS $1,410,155
RECOMMENDED SAVINGS* $169,049 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,156
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes By-product Production Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes By-product Production
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$149,480
Cost:
$150,000
- - - - - - $12,480 270,000 $(-25,000) - $162,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$12,480
270,000
lb
$(-25,000)
-
$
$162,000
-
$
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$13,909
Cost:
$15,800
- - $13,909 1,428 - - - - - - - - -
-
kWh
$13,909
1,428
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$1,987
Cost:
-
$1,987 33,118 - - - - - - - - - - $1,987
33,118
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,413
Cost:
-
$712 23,740 $701 72 - - - - - - - - $712
23,740
kWh
$701
72
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,469
Cost:
$1,548
- - - - $1,469 288 - - - - - - -
-
kWh
-
-
kW-months/year
$1,469
288
MMBtu
-
-
lb
-
-
$
-
-
$
06: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$454
Cost:
$472
- - - - $454 89 - - - - - - -
-
kWh
-
-
kW-months/year
$454
89
MMBtu
-
-
lb
-
-
$
-
-
$
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$337
Cost:
$286
- - - - $337 66 - - - - - - -
-
kWh
-
-
kW-months/year
$337
66
MMBtu
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$169,049
Cost:
$168,106
$2,699 56,858 $14,610 1,500 $2,260 443 $12,480 270,000 $(-25,000) - $162,000 - $2,699
56,858
kWh
$14,610
1,500
kW-months/year
$2,260
443
MMBtu
$12,480
270,000
lb
$(-25,000)
-
$
$162,000
-
$
TOTAL IMPLEMENTED Savings:
$18,156
Cost:
$18,106
$1,987 33,118 $13,909 1,428 $2,260 443 - - - - - - $1,987
33,118
kWh
$13,909
1,428
kW-months/year
$2,260
443
MMBtu
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes By-product Production Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes By-product Production