Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Tennessee |
---|---|
Assessment Year | 1996 |
Principal Product | Wooden kitchen and bath cabinet doors and frames |
NAICS | n/a |
SIC | 2434 - Wood Kitchen Cabinets |
Sales | $10,000,000-$50,000,000 |
# of Employees | 114 |
Plant Area (Sq.Ft.) | 208,000 |
Annual Production | 1,000,000 Pieces |
Production Hrs. Annual | 4,410 |
Location (State) | TN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $119,688 | 3,737,397 | kWh | $0.03 |
Electricity Demand | $88,351 | 10,397 | kW-months/year | $8.50 |
Natural Gas | $47,192 | 10,077 | MMBtu | $4.68 |
TOTAL ENERGY COSTS | $284,171 | |||
RECOMMENDED SAVINGS* | $14,171 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $13,304 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Solid Waste (haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Solid Waste (haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION |
Savings: $5,797 Cost: $1,200 |
$5,797 | 186,987 | - | - | - | - | - | - | - | - | - | - |
$5,797 186,987 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $3,097 Cost: $8,640 |
- | - | - | - | - | - | $2,050 | 82,000 | $2,640 | 82,000 | $(-1,593) | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$2,050 82,000 lb |
$2,640 82,000 lb |
$(-1,593) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $1,810 Cost: $1,890 |
$836 | 26,964 | $974 | 108 | - | - | - | - | - | - | - | - |
$836 26,964 kWh |
$974 108 kW-months/year |
- - MMBtu |
- - lb |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1122 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT |
Savings: $1,791 Cost: - |
- | - | - | - | $1,791 | 381 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,791 381 MMBtu |
- - lb |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $867 Cost: $215 |
$109 | 3,517 | $758 | 84 | - | - | - | - | - | - | - | - |
$109 3,517 kWh |
$758 84 kW-months/year |
- - MMBtu |
- - lb |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $809 Cost: $420 |
$809 | 26,084 | - | - | - | - | - | - | - | - | - | - |
$809 26,084 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $14,171 Cost: $12,365 |
$7,551 | 243,552 | $1,732 | 192 | $1,791 | 381 | $2,050 | 82,000 | $2,640 | 82,000 | $(-1,593) | - | $7,551 243,552 kWh |
$1,732 192 kW-months/year |
$1,791 381 MMBtu |
$2,050 82,000 lb |
$2,640 82,000 lb |
$(-1,593) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $13,304 Cost: $12,150 |
$7,442 | 240,035 | $974 | 108 | $1,791 | 381 | $2,050 | 82,000 | $2,640 | 82,000 | $(-1,593) | - | $7,442 240,035 kWh |
$974 108 kW-months/year |
$1,791 381 MMBtu |
$2,050 82,000 lb |
$2,640 82,000 lb |
$(-1,593) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Solid Waste (haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Solid Waste (haz) | Personnel Changes |