IAC logo
IAC Assessment: TN0601
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0601
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1997
Principal Product Carpentry tools
NAICS n/a
SIC 3423 - Hand And Edge Tools, Nec
Sales $5,000,000-$10,000,000
# of Employees 106
Plant Area (Sq.Ft.) 110,000
Annual Production 2,000,000 Pieces
Production Hrs. Annual 6,000
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $52,664 1,548,945 kWh $0.03
Electricity Demand $39,773 5,631 kW-months/year $7.06
Electricity Fees $1,748 - $ -
Natural Gas $74,619 10,479 MMBtu $7.12
TOTAL ENERGY COSTS $300,076
RECOMMENDED SAVINGS* $27,700 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,005
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Primary Product
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $
01: 4.7110 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM Savings:
$13,200
Cost:
-
- - - - - - - - $(-45,000) - - - $58,200 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$(-45,000)
-
$
-
-
$
$58,200
-
$
02: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$4,865
Cost:
$8,000
- - - - - - $4,865 10,040 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,865
10,040
lb
-
-
$
-
-
$
-
-
$
03: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$3,270
Cost:
-
- - - - - - $3,270 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,270
-
lb
-
-
$
-
-
$
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,960
Cost:
$295
$2,960 95,545 - - - - - - - - - - - - $2,960
95,545
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,045
Cost:
-
$430 13,775 $1,565 192 - - - - - - $50 - - - $430
13,775
kWh
$1,565
192
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$50
-
$
-
-
$
06: 2.7122 DISCONNECT BALLASTS Savings:
$1,190
Cost:
$180
$700 22,567 $490 60 - - - - - - - - - - $700
22,567
kWh
$490
60
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$170
Cost:
$180
- - - - $170 24 - - - - - - - - -
-
kWh
-
-
kW-months/year
$170
24
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$27,700
Cost:
$8,655
$4,090 131,887 $2,055 252 $170 24 $8,135 10,040 $(-45,000) - $50 - $58,200 - $4,090
131,887
kWh
$2,055
252
kW-months/year
$170
24
MMBtu
$8,135
10,040
lb
$(-45,000)
-
$
$50
-
$
$58,200
-
$
TOTAL IMPLEMENTED Savings:
$5,005
Cost:
$295
$3,390 109,320 $1,565 192 - - - - - - $50 - - - $3,390
109,320
kWh
$1,565
192
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$50
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Primary Product