IAC logo
IAC Assessment: TN0606
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0606
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1997
Principal Product Automotive interior door panels
NAICS n/a
SIC 3350 -
Sales $50,000,000-$100,000,000
# of Employees 485
Plant Area (Sq.Ft.) 165,000
Annual Production 1,820,000 Pieces
Production Hrs. Annual 7,056
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $269,453 17,127,491 kWh $0.02
Electricity Demand $326,544 35,496 kW-months/year $9.20
Electricity Fees $23,653 - $ -
LPG $53,138 7,060 MMBtu $7.53
TOTAL ENERGY COSTS $1,807,800
RECOMMENDED SAVINGS* $171,730 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $167,060
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas LPG Solid Waste (non-haz) Primary Raw Material Primary Product Electricity Usage Electricity Demand Natural Gas LPG Solid Waste (non-haz) Primary Raw Material Primary Product
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ lb $ $ $ $
01: 3.1172 REVISE RAW MATERIAL SPECS Savings:
$134,780
Cost:
$10,600
- - - - - - - - $(-2,700) 17,200 $137,480 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$(-2,700)
17,200
lb
$137,480
-
$
-
-
$
02: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL Savings:
$19,980
Cost:
$8,480
- - - - $(-33,182) (-7,060) $53,162 7,060 - - - - - - -
-
kWh
-
-
kW-months/year
$(-33,182)
(-7,060)
MMBtu
$53,162
7,060
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,900
Cost:
$3,800
$1,640 102,579 $3,260 360 - - - - - - - - - - $1,640
102,579
kWh
$3,260
360
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
04: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$4,800
Cost:
-
- - - - - - - - $4,800 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$4,800
-
lb
-
-
$
-
-
$
05: 4.321 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES Savings:
$2,600
Cost:
-
- - - - - - - - - - - - $2,600 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
$2,600
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,320
Cost:
$2,800
$800 49,824 $1,520 168 - - - - - - - - - - $800
49,824
kWh
$1,520
168
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
07: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,000
Cost:
$375
$1,020 63,599 $980 108 - - - - - - - - - - $1,020
63,599
kWh
$980
108
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$350
Cost:
$400
$20 1,172 $330 36 - - - - - - - - - - $20
1,172
kWh
$330
36
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$171,730
Cost:
$26,455
$3,480 217,174 $6,090 672 $(-33,182) (-7,060) $53,162 7,060 $2,100 17,200 $137,480 - $2,600 - $3,480
217,174
kWh
$6,090
672
kW-months/year
$(-33,182)
(-7,060)
MMBtu
$53,162
7,060
MMBtu
$2,100
17,200
lb
$137,480
-
$
$2,600
-
$
TOTAL IMPLEMENTED Savings:
$167,060
Cost:
$22,880
$1,640 102,579 $3,260 360 $(-33,182) (-7,060) $53,162 7,060 $2,100 17,200 $137,480 - $2,600 - $1,640
102,579
kWh
$3,260
360
kW-months/year
$(-33,182)
(-7,060)
MMBtu
$53,162
7,060
MMBtu
$2,100
17,200
lb
$137,480
-
$
$2,600
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas LPG Solid Waste (non-haz) Primary Raw Material Primary Product Electricity Usage Electricity Demand Natural Gas LPG Solid Waste (non-haz) Primary Raw Material Primary Product