IAC logo
IAC Assessment: TN0622
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0622
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1998
Principal Product Commercial printed material
NAICS n/a
SIC 2752 - Commercial Printing, Lithographic
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 67,000
Annual Production 234,000,000 Pieces
Production Hrs. Annual 7,488
Location (State) SC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $58,523 2,432,884 kWh $0.02
Electricity Demand $54,646 5,873 kW-months/year $9.30
Electricity Fees $408 - $ -
Natural Gas $31,244 4,992 MMBtu $6.26
TOTAL ENERGY COSTS $146,555
RECOMMENDED SAVINGS* $112,115 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $745
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ lb $ $ $ $ $ $
01: 3.1192 REDUCE SCRAP PRODUCTION Savings:
$54,000
Cost:
$34,400
- - - - - - - - $54,000 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$54,000
-
$
-
-
$
02: 4.624 HIRE ADDITIONAL PERSONNEL TO REDUCE CHANGEOUT TIME Savings:
$28,700
Cost:
$17,200
$(-550) (-23,154) - - - - - - - - $29,250 - $(-550)
(-23,154)
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
$29,250
-
$
03: 4.421 MODIFY CURRENT INCENTIVE PROGRAM Savings:
$25,000
Cost:
$10,000
- - - - - - $(-10,000) - - - $35,000 - -
-
kWh
-
-
kW-months/year
-
-
lb
$(-10,000)
-
$
-
-
$
$35,000
-
$
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,750
Cost:
$780
$2,750 114,596 - - - - - - - - - - $2,750
114,596
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
05: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$745
Cost:
-
- - - - $745 - - - - - - - -
-
kWh
-
-
kW-months/year
$745
-
lb
-
-
$
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$580
Cost:
$225
$120 4,982 $460 48 - - - - - - - - $120
4,982
kWh
$460
48
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$340
Cost:
-
$110 4,689 $230 24 - - - - - - - - $110
4,689
kWh
$230
24
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$112,115
Cost:
$62,605
$2,430 101,113 $690 72 $745 - $(-10,000) - $54,000 - $64,250 - $2,430
101,113
kWh
$690
72
kW-months/year
$745
-
lb
$(-10,000)
-
$
$54,000
-
$
$64,250
-
$
TOTAL IMPLEMENTED Savings:
$745
Cost:
-
- - - - $745 - - - - - - - -
-
kWh
-
-
kW-months/year
$745
-
lb
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Primary Product