IAC logo
IAC Assessment: TN0634
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0634
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1998
Principal Product Wood and upholstered household furniture
NAICS n/a
SIC 2512 - Upholstered Household Furniture
Sales $10,000,000-$50,000,000
# of Employees 160
Plant Area (Sq.Ft.) 180,000
Annual Production 5,000 Pieces
Production Hrs. Annual 2,080
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $62,793 1,487,691 kWh $0.04
Electricity Demand $53,718 7,440 kW-months/year $7.22
Electricity Fees $3,677 - $ -
Natural Gas $61,245 9,582 MMBtu $6.39
TOTAL ENERGY COSTS $828,072
RECOMMENDED SAVINGS* $171,658 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $161,868
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Primary Product
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $ $ $
01: 4.4310 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$84,680
Cost:
$200,000
- - - - - - - - $(-64,900) - $(-30,420) - - - $180,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$(-64,900)
-
$
$(-30,420)
-
$
-
-
$
$180,000
-
$
02: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$67,500
Cost:
$50,000
- - - - - - $(-67,500) 112,500 - - - - $135,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$(-67,500)
112,500
lb
-
-
$
-
-
$
$135,000
-
$
-
-
$
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$5,720
Cost:
$2,600
$2,860 67,995 $2,860 396 - - - - - - - - - - - - $2,860
67,995
kWh
$2,860
396
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
04: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$3,600
Cost:
-
- - - - - - $3,600 - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,600
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
05: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION Savings:
$2,990
Cost:
$8,575
$2,990 71,219 - - - - - - - - - - - - - - $2,990
71,219
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,990
Cost:
$510
$1,990 47,479 - - - - - - - - - - - - - - $1,990
47,479
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
07: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE Savings:
$1,460
Cost:
-
- - - - $1,460 228 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$1,460
228
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
08: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$1,310
Cost:
-
- - - - $1,310 204 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$1,310
204
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,038
Cost:
$1,820
$345 8,206 $693 96 - - - - - - - - - - - - $345
8,206
kWh
$693
96
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
10: 2.2511 INSULATE BARE EQUIPMENT Savings:
$430
Cost:
$390
- - - - $430 67 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$430
67
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
11: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$320
Cost:
$960
- - - - $320 50 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$320
50
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
12: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$310
Cost:
$295
- - - - $310 48 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$310
48
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
13: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$310
Cost:
$500
$135 3,224 $175 24 - - - - - - - - - - - - $135
3,224
kWh
$175
24
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$171,658
Cost:
$265,650
$8,320 198,123 $3,728 516 $3,830 597 $(-63,900) 112,500 $(-64,900) - $(-30,420) - $135,000 - $180,000 - $8,320
198,123
kWh
$3,728
516
kW-months/year
$3,830
597
MMBtu
$(-63,900)
112,500
lb
$(-64,900)
-
$
$(-30,420)
-
$
$135,000
-
$
$180,000
-
$
TOTAL IMPLEMENTED Savings:
$161,868
Cost:
$256,685
$5,330 126,904 $3,728 516 $630 98 $(-67,500) 112,500 $(-64,900) - $(-30,420) - $135,000 - $180,000 - $5,330
126,904
kWh
$3,728
516
kW-months/year
$630
98
MMBtu
$(-67,500)
112,500
lb
$(-64,900)
-
$
$(-30,420)
-
$
$135,000
-
$
$180,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Primary Product