IAC Assessment: TN0635
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0635
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1998
Principal Product Benzoic acid, benzoyl chloride, muriatic acid, benzophenone
NAICS n/a
SIC 2869 - Industrial Organic Chemicals, Nec
Sales $10,000,000-$50,000,000
# of Employees 148
Plant Area (Sq.Ft.) 400,000
Annual Production 102,817,716 Pounds
Production Hrs. Annual 8,736
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $727,508 30,321,806 kWh $0.02
Electricity Demand $324,852 46,064 kW-months/year $7.05
Electricity Fees $78,278 - $ -
Natural Gas $2,421,614 766,525 MMBtu $3.16
TOTAL ENERGY COSTS $4,284,195
RECOMMENDED SAVINGS* $508,670 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $48,780
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (non-haz) Solid Waste (haz) Administrative Changes Ancillary Material Cost Water Consumption Electricity Usage Natural Gas Solid Waste (non-haz) Solid Waste (haz) Administrative Changes Ancillary Material Cost Water Consumption
$ kWh $ MMBtu $ lb $ lb $ $ $ $ $ Tgal
01: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$429,120
Cost:
$36,880
- - $262,120 82,950 - - - - - - - - $167,000 - -
-
kWh
$262,120
82,950
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
$167,000
-
Tgal
02: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$39,020
Cost:
$13,600
$(-1,500) (-65,064) - - $20,120 - - - $20,400 - - - - - $(-1,500)
(-65,064)
kWh
-
-
MMBtu
$20,120
-
lb
-
-
lb
$20,400
-
$
-
-
$
-
-
Tgal
03: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE Savings:
$22,590
Cost:
$46,880
- - $22,590 7,150 - - - - - - - - - - -
-
kWh
$22,590
7,150
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
-
-
Tgal
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$9,760
Cost:
$3,580
- - $9,760 3,090 - - - - - - - - - - -
-
kWh
$9,760
3,090
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
-
-
Tgal
05: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$8,180
Cost:
-
- - - - - - $102,440 251,100 - - $(-94,260) - - - -
-
kWh
-
-
MMBtu
-
-
lb
$102,440
251,100
lb
-
-
$
$(-94,260)
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$508,670
Cost:
$100,940
$(-1,500) (-65,064) $294,470 93,190 $20,120 - $102,440 251,100 $20,400 - $(-94,260) - $167,000 - $(-1,500)
(-65,064)
kWh
$294,470
93,190
MMBtu
$20,120
-
lb
$102,440
251,100
lb
$20,400
-
$
$(-94,260)
-
$
$167,000
-
Tgal
TOTAL IMPLEMENTED Savings:
$48,780
Cost:
$17,180
$(-1,500) (-65,064) $9,760 3,090 $20,120 - - - $20,400 - - - - - $(-1,500)
(-65,064)
kWh
$9,760
3,090
MMBtu
$20,120
-
lb
-
-
lb
$20,400
-
$
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ MMBtu $ lb $ lb $ $ $ $ $ Tgal
Electricity Usage Natural Gas Solid Waste (non-haz) Solid Waste (haz) Administrative Changes Ancillary Material Cost Water Consumption Electricity Usage Natural Gas Solid Waste (non-haz) Solid Waste (haz) Administrative Changes Ancillary Material Cost Water Consumption