IAC Assessment: TN0638
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1998
Principal Product Polymers, coatings, adhesives
NAICS n/a
SIC 3069 - Fabricated Rubber Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 160
Plant Area (Sq.Ft.) 585,000
Annual Production 116,000,000 Pounds
Production Hrs. Annual 7,488
Location (State) SC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $111,742 3,527,550 kWh $0.03
Electricity Demand $58,756 8,868 kW-months/year $6.63
Electricity Fees $768 - $ -
Natural Gas $111,714 29,476 MMBtu $3.79
TOTAL ENERGY COSTS $301,400
RECOMMENDED SAVINGS* $702,640 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $596,250
#|Description Savings
Cost
Status Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Administrative Changes Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Administrative Changes
$ kW-months/year $ MMBtu $ gal $ lb $ $
01: 4.322 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL Savings:
$580,000
Cost:
$27,200
- - - - - - - - $580,000 - -
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$580,000
-
$
02: 4.721 INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION Savings:
$88,890
Cost:
$200,000
- - - - - - - - $88,890 - -
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$88,890
-
$
03: 3.1182 MAKE A NEW BY-PRODUCT Savings:
$17,500
Cost:
$68,200
- - - - - - $17,500 16,000 - - -
-
kW-months/year
-
-
MMBtu
-
-
gal
$17,500
16,000
lb
-
-
$
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$7,990
Cost:
-
$7,990 840 - - - - - - - - $7,990
840
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
05: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$7,220
Cost:
$6,550
- - $7,220 1,910 - - - - - - -
-
kW-months/year
$7,220
1,910
MMBtu
-
-
gal
-
-
lb
-
-
$
06: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$920
Cost:
$560
- - - - $920 6,296 - - - - -
-
kW-months/year
-
-
MMBtu
$920
6,296
gal
-
-
lb
-
-
$
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$120
Cost:
$390
- - $120 31 - - - - - - -
-
kW-months/year
$120
31
MMBtu
-
-
gal
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$702,640
Cost:
$302,900
$7,990 840 $7,340 1,941 $920 6,296 $17,500 16,000 $668,890 - $7,990
840
kW-months/year
$7,340
1,941
MMBtu
$920
6,296
gal
$17,500
16,000
lb
$668,890
-
$
TOTAL IMPLEMENTED Savings:
$596,250
Cost:
$34,700
$7,990 840 $7,340 1,941 $920 6,296 - - $580,000 - $7,990
840
kW-months/year
$7,340
1,941
MMBtu
$920
6,296
gal
-
-
lb
$580,000
-
$
Savings
Cost
$ kW-months/year $ MMBtu $ gal $ lb $ $
Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Administrative Changes Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Administrative Changes