IAC logo
IAC Assessment: TN0642
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0642
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1998
Principal Product Sheet metal siding and roofing panels
NAICS n/a
SIC 3440 -
Sales $10,000,000-$50,000,000
# of Employees 35
Plant Area (Sq.Ft.) 12,000
Annual Production 22,000,000 Pounds
Production Hrs. Annual 2,080
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $19,565 449,883 kWh $0.04
Electricity Demand $8,863 1,466 kW-months/year $6.05
Electricity Fees $424 - $ -
Natural Gas $6,314 8,246 MMBtu $0.77
TOTAL ENERGY COSTS $282,588
RECOMMENDED SAVINGS* $341,135 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $294,005
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Product By-product Production Increase in Production Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Product By-product Production Increase in Production
$ kWh $ kW-months/year $ lb $ $ $ $ $ $ $ $ $ %
01: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$177,600
Cost:
$510,000
- - - - $110,845 179,200 - - - - - - - - $66,755 - -
-
kWh
-
-
kW-months/year
$110,845
179,200
lb
-
-
$
-
-
$
-
-
$
-
-
$
$66,755
-
%
02: 4.421 MODIFY CURRENT INCENTIVE PROGRAM Savings:
$81,550
Cost:
$16,885
- - - - - - $19,140 - $(-106,760) - $169,170 - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$19,140
-
$
$(-106,760)
-
$
$169,170
-
$
-
-
$
-
-
%
03: 4.322 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL Savings:
$45,000
Cost:
$26,000
- - - - - - - - $45,000 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$45,000
-
$
-
-
$
-
-
$
-
-
%
04: 3.1192 REDUCE SCRAP PRODUCTION Savings:
$33,515
Cost:
$24,000
- - - - $44,535 72,000 - - $(-16,750) - $5,730 - - - - - -
-
kWh
-
-
kW-months/year
$44,535
72,000
lb
-
-
$
$(-16,750)
-
$
$5,730
-
$
-
-
$
-
-
%
05: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$2,130
Cost:
$1,200
- - - - - - - - - - - - $2,130 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
$2,130
-
$
-
-
%
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$660
Cost:
$2,190
$310 9,379 $350 36 - - - - - - - - - - - - $310
9,379
kWh
$350
36
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
%
07: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$300
Cost:
-
$300 9,086 - - - - - - - - - - - - - - $300
9,086
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
%
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$230
Cost:
$500
$110 3,224 $120 12 - - - - - - - - - - - - $110
3,224
kWh
$120
12
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
%
09: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$150
Cost:
-
$30 879 $120 12 - - - - - - - - - - - - $30
879
kWh
$120
12
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$341,135
Cost:
$580,775
$750 22,568 $590 60 $155,380 251,200 $19,140 - $(-78,510) - $174,900 - $2,130 - $66,755 - $750
22,568
kWh
$590
60
kW-months/year
$155,380
251,200
lb
$19,140
-
$
$(-78,510)
-
$
$174,900
-
$
$2,130
-
$
$66,755
-
%
TOTAL IMPLEMENTED Savings:
$294,005
Cost:
$553,575
$750 22,568 $590 60 $155,380 251,200 $19,140 - $(-123,510) - $174,900 - - - $66,755 - $750
22,568
kWh
$590
60
kW-months/year
$155,380
251,200
lb
$19,140
-
$
$(-123,510)
-
$
$174,900
-
$
-
-
$
$66,755
-
%
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $ $ $ $ $ $ %
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Product By-product Production Increase in Production Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Product By-product Production Increase in Production