IAC logo
IAC Assessment: TN0652
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0652
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1999
Principal Product Wooden bedroom furniture
NAICS n/a
SIC 2511 - Wood Household Furniture
Sales $10,000,000-$50,000,000
# of Employees 400
Plant Area (Sq.Ft.) 450,000
Annual Production 300,000 Pieces
Production Hrs. Annual 4,250
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $459,311 10,006,448 kWh $0.05
Electricity Demand $131,127 24,578 kW-months/year $5.34
Electricity Fees $18,891 - $ -
Wood $400,000 104,000 MMBtu $3.85
TOTAL ENERGY COSTS $1,033,804
RECOMMENDED SAVINGS* $418,090 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $241,950
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Wood Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Wood Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $ $ $ $ $
01: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$189,625
Cost:
$28,000
- - - - - - $460 23,000 $565 - $(-2,400) - $191,000 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$460
23,000
lb
$565
-
$
$(-2,400)
-
$
$191,000
-
$
-
-
$
-
-
$
02: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION Savings:
$34,710
Cost:
$27,240
$34,710 738,570 - - - - - - - - - - - - - - - - $34,710
738,570
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
03: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$23,000
Cost:
$60,500
- - - - - - $3,000 150,000 - - - - - - $20,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,000
150,000
lb
-
-
$
-
-
$
-
-
$
$20,000
-
$
-
-
$
04: 4.421 MODIFY CURRENT INCENTIVE PROGRAM Savings:
$18,000
Cost:
$49,200
- - - - - - - - $300,000 - $(-540,000) - - - - - $258,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$300,000
-
$
$(-540,000)
-
$
-
-
$
-
-
$
$258,000
-
$
05: 4.322 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL Savings:
$5,625
Cost:
$16,000
- - - - - - - - - - $5,625 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$5,625
-
$
-
-
$
-
-
$
-
-
$
06: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$4,000
Cost:
$100
- - - - $4,000 1,040 - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$4,000
1,040
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,700
Cost:
$4,000
$1,350 28,722 $350 72 - - - - - - - - - - - - - - $1,350
28,722
kWh
$350
72
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
08: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$96,250
Cost:
$400,000
- - - - $96,250 25,000 - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$96,250
25,000
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
09: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$28,970
Cost:
$300
- - - - $28,970 11,875 - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$28,970
11,875
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
10: 2.1223 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) Savings:
$16,210
Cost:
$10,000
- - - - $16,210 4,210 - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$16,210
4,210
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$418,090
Cost:
$595,340
$36,060 767,292 $350 72 $145,430 42,125 $3,460 173,000 $300,565 - $(-536,775) - $191,000 - $20,000 - $258,000 - $36,060
767,292
kWh
$350
72
kW-months/year
$145,430
42,125
MMBtu
$3,460
173,000
lb
$300,565
-
$
$(-536,775)
-
$
$191,000
-
$
$20,000
-
$
$258,000
-
$
TOTAL IMPLEMENTED Savings:
$241,950
Cost:
$157,800
$1,350 28,722 $350 72 $4,000 1,040 $3,460 173,000 $300,565 - $(-536,775) - $191,000 - $20,000 - $258,000 - $1,350
28,722
kWh
$350
72
kW-months/year
$4,000
1,040
MMBtu
$3,460
173,000
lb
$300,565
-
$
$(-536,775)
-
$
$191,000
-
$
$20,000
-
$
$258,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Wood Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Wood Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost Primary Product