IAC Assessment: TN0657
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0657
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1999
Principal Product Truck Equipment
NAICS n/a
SIC 3715 - Truck Trailers
Sales $10,000,000-$50,000,000
# of Employees 160
Plant Area (Sq.Ft.) 140,000
Annual Production 1,600 Pieces
Production Hrs. Annual 2,080
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $58,996 2,025,205 kWh $0.03
Electricity Demand $23,070 7,768 kW-months/year $2.97
Electricity Fees $7,459 - $ -
Natural Gas $18,855 3,483 MMBtu $5.41
TOTAL ENERGY COSTS $108,380
RECOMMENDED SAVINGS* $181,955 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $181,955
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Primary Raw Material Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Primary Raw Material Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,885
Cost:
$13,800
$3,315 114,302 $1,570 528 - - - - - - $3,315
114,302
kWh
$1,570
528
kW-months/year
-
-
$
-
-
$
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$320
Cost:
$805
$210 7,327 $110 36 - - - - - - $210
7,327
kWh
$110
36
kW-months/year
-
-
$
-
-
$
-
-
$
03: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$64,750
Cost:
$890
- - - - $64,750 - - - - - -
-
kWh
-
-
kW-months/year
$64,750
-
$
-
-
$
-
-
$
04: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$2,000
Cost:
-
- - - - - - $2,000 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$2,000
-
$
-
-
$
05: 4.451 ADD ADDITIONAL PRODUCTION SHIFT Savings:
$110,000
Cost:
$61,600
- - - - - - - - $110,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$110,000
-
$
TOTAL RECOMMENDED Savings:
$181,955
Cost:
$77,095
$3,525 121,629 $1,680 564 $64,750 - $2,000 - $110,000 - $3,525
121,629
kWh
$1,680
564
kW-months/year
$64,750
-
$
$2,000
-
$
$110,000
-
$
TOTAL IMPLEMENTED Savings:
$181,955
Cost:
$77,095
$3,525 121,629 $1,680 564 $64,750 - $2,000 - $110,000 - $3,525
121,629
kWh
$1,680
564
kW-months/year
$64,750
-
$
$2,000
-
$
$110,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Primary Raw Material Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Primary Raw Material Ancillary Material Cost Primary Product