IAC logo
IAC Assessment: TN0668
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0668
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1999
Principal Product Corrugater cardboard containers
NAICS n/a
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 135,000
Annual Production 200,000 Pieces
Production Hrs. Annual 6,120
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $142,330 3,889,508 kWh $0.04
Electricity Demand $86,617 9,958 kW-months/year $8.70
Natural Gas $163,236 38,561 MMBtu $4.23
TOTAL ENERGY COSTS $392,183
RECOMMENDED SAVINGS* $944,251 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $704,076
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ Tgal $ lb $ $ $ $ $ $ $ $
01: 3.1192 REDUCE SCRAP PRODUCTION Savings:
$674,570
Cost:
$64,500
- - - - - - - - $729,000 3,645,000 $(-23,870) - $(-30,560) - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
$729,000
3,645,000
lb
$(-23,870)
-
$
$(-30,560)
-
$
-
-
$
-
-
$
02: 4.211 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE Savings:
$238,000
Cost:
$110,000
- - - - - - - - $221,000 33,150 - - - - $17,000 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
$221,000
33,150
lb
-
-
$
-
-
$
$17,000
-
$
-
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$9,000
Cost:
$26,000
- - - - $9,000 - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$9,000
-
$
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
04: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$7,860
Cost:
$8,370
- - - - - - - - $7,860 78,630 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
$7,860
78,630
lb
-
-
$
-
-
$
-
-
$
-
-
$
05: 4.421 MODIFY CURRENT INCENTIVE PROGRAM Savings:
$6,300
Cost:
$1,200
- - - - - - - - - - - - $2,000 - - - $4,300 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
-
-
lb
-
-
$
$2,000
-
$
-
-
$
$4,300
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,696
Cost:
-
$1,325 38,980 $1,371 12 - - - - - - - - - - - - - - $1,325
38,980
kWh
$1,371
12
kW-months/year
-
-
$
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2,175
Cost:
$1,280
$2,175 151,817 - - - - - - - - - - - - - - - - $2,175
151,817
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
08: 3.4155 METER WASTE WATER Savings:
$1,120
Cost:
$3,300
- - - - - - $1,120 361,755 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,120
361,755
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
09: 2.2511 INSULATE BARE EQUIPMENT Savings:
$940
Cost:
$540
$940 65,358 - - - - - - - - - - - - - - - - $940
65,358
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
10: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$900
Cost:
$196
$900 62,720 - - - - - - - - - - - - - - - - $900
62,720
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
11: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION Savings:
$690
Cost:
-
$690 20,223 - - - - - - - - - - - - - - - - $690
20,223
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$944,251
Cost:
$215,386
$6,030 339,098 $1,371 12 $9,000 - $1,120 361,755 $957,860 3,756,780 $(-23,870) - $(-28,560) - $17,000 - $4,300 - $6,030
339,098
kWh
$1,371
12
kW-months/year
$9,000
-
$
$1,120
361,755
Tgal
$957,860
3,756,780
lb
$(-23,870)
-
$
$(-28,560)
-
$
$17,000
-
$
$4,300
-
$
TOTAL IMPLEMENTED Savings:
$704,076
Cost:
$104,106
$3,855 187,281 $1,371 12 $9,000 - $1,120 361,755 $736,860 3,723,630 $(-23,870) - $(-28,560) - - - $4,300 - $3,855
187,281
kWh
$1,371
12
kW-months/year
$9,000
-
$
$1,120
361,755
Tgal
$736,860
3,723,630
lb
$(-23,870)
-
$
$(-28,560)
-
$
-
-
$
$4,300
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ Tgal $ lb $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material One-time Revenue or Avoided Cost