Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 2000
Principal Product Hardwood Flooring
NAICS n/a
SIC 2426 - Hardwood Dimension & Flooring Mills
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 300,000
Annual Production 15,000 Thousand Feet
Production Hrs. Annual 4,000
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $149,725 4,422,919 kWh $0.03
Electricity Demand $75,158 12,526 kW-months/year $6.00
Electricity Fees $9,373 - $ -
TOTAL ENERGY COSTS $234,256
RECOMMENDED SAVINGS* $154,858 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $40,310
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) One-time Revenue or Avoided Cost Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) One-time Revenue or Avoided Cost Primary Product
$ kWh $ kW-months/year $ lb $ $ $ $
01: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL Savings:
$75,400
Cost:
$400,000
- - - - - - $75,400 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$75,400
-
$
-
-
$
02: 4.4210 MODIFY CURRENT INCENTIVE PROGRAM Savings:
$37,500
Cost:
$16,430
- - - - - - - - $37,500 - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$37,500
-
$
03: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$30,832
Cost:
$1,075
$3,832 61,254 - - - - - - $27,000 - $3,832
61,254
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$27,000
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,356
Cost:
$18,370
$5,650 166,178 $1,706 24 - - - - - - $5,650
166,178
kWh
$1,706
24
kW-months/year
-
-
lb
-
-
$
-
-
$
05: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$2,810
Cost:
$500
- - - - $2,810 18,750 - - - - -
-
kWh
-
-
kW-months/year
$2,810
18,750
lb
-
-
$
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$960
Cost:
-
$960 15,533 - - - - - - - - $960
15,533
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$154,858
Cost:
$436,375
$10,442 242,965 $1,706 24 $2,810 18,750 $75,400 - $64,500 - $10,442
242,965
kWh
$1,706
24
kW-months/year
$2,810
18,750
lb
$75,400
-
$
$64,500
-
$
TOTAL IMPLEMENTED Savings:
$40,310
Cost:
$16,930
- - - - $2,810 18,750 - - $37,500 - -
-
kWh
-
-
kW-months/year
$2,810
18,750
lb
-
-
$
$37,500
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) One-time Revenue or Avoided Cost Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) One-time Revenue or Avoided Cost Primary Product