IAC logo
IAC Assessment: TN0686
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0686
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 2000
Principal Product kayaks
NAICS n/a
SIC 3732 - Boat Building And Repairing
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 74,000
Annual Production 14,250 Pieces
Production Hrs. Annual 7,344
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $45,705 972,157 kWh $0.05
Electricity Demand $15,311 2,663 kW-months/year $5.75
Electricity Fees $2,067 - $ -
LPG $72,028 11,225 MMBtu $6.42
TOTAL ENERGY COSTS $182,191
RECOMMENDED SAVINGS* $82,820 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $39,000
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Solid Waste (non-haz) Administrative Changes Primary Product Electricity Usage Electricity Demand LPG Solid Waste (non-haz) Administrative Changes Primary Product
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 4.421 MODIFY CURRENT INCENTIVE PROGRAM Savings:
$30,000
Cost:
$16,430
- - - - - - - - - - $30,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$30,000
-
$
02: 4.721 INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION Savings:
$24,000
Cost:
$50,000
- - - - - - - - - - $24,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$24,000
-
$
03: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$9,000
Cost:
$5,960
- - - - - - $9,000 150,000 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$9,000
150,000
lb
-
-
$
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$7,260
Cost:
$18,810
- - - - $7,260 988 - - - - - - -
-
kWh
-
-
kW-months/year
$7,260
988
MMBtu
-
-
lb
-
-
$
-
-
$
05: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$5,550
Cost:
$1,120
- - - - - - $5,550 9,000 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$5,550
9,000
lb
-
-
$
-
-
$
06: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$2,510
Cost:
$4,780
- - $2,510 20 - - - - - - - - -
-
kWh
$2,510
20
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
07: 2.7145 INSTALL SKYLIGHTS Savings:
$2,460
Cost:
$7,100
$2,460 37,808 - - - - - - - - - - $2,460
37,808
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
08: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$1,280
Cost:
$600
- - - - - - $470 16,240 $810 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$470
16,240
lb
$810
-
$
-
-
$
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$760
Cost:
$925
$760 11,723 - - - - - - - - - - $760
11,723
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$82,820
Cost:
$105,725
$3,220 49,531 $2,510 20 $7,260 988 $15,020 175,240 $810 - $54,000 - $3,220
49,531
kWh
$2,510
20
kW-months/year
$7,260
988
MMBtu
$15,020
175,240
lb
$810
-
$
$54,000
-
$
TOTAL IMPLEMENTED Savings:
$39,000
Cost:
$22,390
- - - - - - $9,000 150,000 - - $30,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$9,000
150,000
lb
-
-
$
$30,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand LPG Solid Waste (non-haz) Administrative Changes Primary Product Electricity Usage Electricity Demand LPG Solid Waste (non-haz) Administrative Changes Primary Product