IAC logo
IAC Assessment: TN0691
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0691
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 2000
Principal Product Wooden cabinetry components
NAICS n/a
SIC 2426 - Hardwood Dimension & Flooring Mills
Sales n/a
# of Employees 252
Plant Area (Sq.Ft.) 212,230
Annual Production 11,750,000 Thousand Feet
Production Hrs. Annual 6,000
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $533,226 8,631,008 kWh $0.06
Electricity Demand $210,915 20,126 kW-months/year $10.48
TOTAL ENERGY COSTS $761,141
RECOMMENDED SAVINGS* $381,250 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $640
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product
$ kWh $ kW-months/year $ lb $ $
01: 4.7210 INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION Savings:
$144,950
Cost:
$100,000
$26,600 431,419 - - $850 485,361 $117,500 - $26,600
431,419
kWh
-
-
kW-months/year
$850
485,361
lb
$117,500
-
$
02: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$110,155
Cost:
$5,075
- - - - - - $110,155 - -
-
kWh
-
-
kW-months/year
-
-
lb
$110,155
-
$
03: 4.4210 MODIFY CURRENT INCENTIVE PROGRAM Savings:
$85,000
Cost:
$16,580
- - - - - - $85,000 - -
-
kWh
-
-
kW-months/year
-
-
lb
$85,000
-
$
04: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$16,545
Cost:
$18,900
- - $16,545 117 - - - - -
-
kWh
$16,545
117
kW-months/year
-
-
lb
-
-
$
05: 2.3414 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT Savings:
$11,700
Cost:
$35,640
$11,700 188,746 - - - - - - $11,700
188,746
kWh
-
-
kW-months/year
-
-
lb
-
-
$
06: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$10,100
Cost:
-
- - - - $10,100 - - - -
-
kWh
-
-
kW-months/year
$10,100
-
lb
-
-
$
07: 2.7145 INSTALL SKYLIGHTS Savings:
$2,160
Cost:
$9,680
$2,160 34,877 - - - - - - $2,160
34,877
kWh
-
-
kW-months/year
-
-
lb
-
-
$
08: 3.7196 USE RE-USABLE FILTERS Savings:
$640
Cost:
-
- - - - $640 110 - - -
-
kWh
-
-
kW-months/year
$640
110
lb
-
-
$
TOTAL RECOMMENDED Savings:
$381,250
Cost:
$185,875
$40,460 655,042 $16,545 117 $11,590 485,471 $312,655 - $40,460
655,042
kWh
$16,545
117
kW-months/year
$11,590
485,471
lb
$312,655
-
$
TOTAL IMPLEMENTED Savings:
$640
Cost:
-
- - - - $640 110 - - -
-
kWh
-
-
kW-months/year
$640
110
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product