Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Tennessee |
---|---|
Assessment Year | 2000 |
Principal Product | distribution switch gear |
NAICS | n/a |
SIC | 3629 - Electrical Industrial Apparatus, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 630 |
Plant Area (Sq.Ft.) | 360,000 |
Annual Production | 8,100 Pieces |
Production Hrs. Annual | 6,500 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $201,962 | 7,552,755 | kWh | $0.03 |
Electricity Demand | $206,012 | 16,716 | kW-months/year | $12.32 |
TOTAL ENERGY COSTS | $1,561,952 | |||
RECOMMENDED SAVINGS* | $4,545,631 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $914,911 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Electricity Fees | Solid Waste (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.453 RESCHEDULE BREAKS TO ALLOW FOR CONTINUOUS PRODUCTION |
Savings: $3,613,000 Cost: $645,000 |
- | - | - | - | $18,000 | - | - | - | $3,595,000 | - |
- - kWh |
- - kW-months/year |
$18,000 - $ |
- - lb |
$3,595,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.451 ADD ADDITIONAL PRODUCTION SHIFT |
Savings: $899,000 Cost: $967,000 |
- | - | - | - | - | - | - | - | $899,000 | - |
- - kWh |
- - kW-months/year |
- - $ |
- - lb |
$899,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $10,500 Cost: $700 |
$10,500 | 1,190,211 | - | - | - | - | - | - | - | - |
$10,500 1,190,211 kWh |
- - kW-months/year |
- - $ |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER |
Savings: $7,220 Cost: $11,900 |
- | - | $7,220 | 111 | - | - | - | - | - | - |
- - kWh |
$7,220 111 kW-months/year |
- - $ |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.5311 RECOVER AND REUSE WASTE MATERIAL |
Savings: $4,210 Cost: - |
- | - | - | - | - | - | $4,210 | - | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$4,210 - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $3,650 Cost: - |
$3,650 | 121,630 | - | - | - | - | - | - | - | - |
$3,650 121,630 kWh |
- - kW-months/year |
- - $ |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $3,600 Cost: $900 |
- | - | $3,600 | 56 | - | - | - | - | - | - |
- - kWh |
$3,600 56 kW-months/year |
- - $ |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,336 Cost: - |
$2,611 | 87,046 | $725 | 11 | - | - | - | - | - | - |
$2,611 87,046 kWh |
$725 11 kW-months/year |
- - $ |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $1,115 Cost: $1,300 |
$668 | 22,274 | $447 | 7 | - | - | - | - | - | - |
$668 22,274 kWh |
$447 7 kW-months/year |
- - $ |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $4,545,631 Cost: $1,626,800 |
$17,429 | 1,421,161 | $11,992 | 185 | $18,000 | - | $4,210 | - | $4,494,000 | - | $17,429 1,421,161 kWh |
$11,992 185 kW-months/year |
$18,000 - $ |
$4,210 - lb |
$4,494,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $914,911 Cost: $969,200 |
$6,929 | 230,950 | $4,772 | 74 | - | - | $4,210 | - | $899,000 | - | $6,929 230,950 kWh |
$4,772 74 kW-months/year |
- - $ |
$4,210 - lb |
$899,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Electricity Fees | Solid Waste (non-haz) | Personnel Changes |