IAC Assessment: TN0692
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0692
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 2000
Principal Product distribution switch gear
NAICS n/a
SIC 3629 - Electrical Industrial Apparatus, Nec
Sales $10,000,000-$50,000,000
# of Employees 630
Plant Area (Sq.Ft.) 360,000
Annual Production 8,100 Pieces
Production Hrs. Annual 6,500
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $201,962 7,552,755 kWh $0.03
Electricity Demand $206,012 16,716 kW-months/year $12.32
TOTAL ENERGY COSTS $1,561,952
RECOMMENDED SAVINGS* $4,545,631 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $914,911
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ $ $ lb $ $
01: 4.4530 RESCHEDULE BREAKS TO ALLOW FOR CONTINUOUS PRODUCTION Savings:
$3,613,000
Cost:
$645,000
- - - - $18,000 - - - $3,595,000 - -
-
kWh
-
-
kW-months/year
$18,000
-
$
-
-
lb
$3,595,000
-
$
02: 4.4510 ADD ADDITIONAL PRODUCTION SHIFT Savings:
$899,000
Cost:
$967,000
- - - - - - - - $899,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
lb
$899,000
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$10,500
Cost:
$700
$10,500 1,190,211 - - - - - - - - $10,500
1,190,211
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
04: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$7,220
Cost:
$11,900
- - $7,220 111 - - - - - - -
-
kWh
$7,220
111
kW-months/year
-
-
$
-
-
lb
-
-
$
05: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$4,210
Cost:
-
- - - - - - $4,210 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$4,210
-
lb
-
-
$
06: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$3,650
Cost:
-
$3,650 121,630 - - - - - - - - $3,650
121,630
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
07: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$3,600
Cost:
$900
- - $3,600 56 - - - - - - -
-
kWh
$3,600
56
kW-months/year
-
-
$
-
-
lb
-
-
$
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,336
Cost:
-
$2,611 87,046 $725 11 - - - - - - $2,611
87,046
kWh
$725
11
kW-months/year
-
-
$
-
-
lb
-
-
$
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,115
Cost:
$1,300
$668 22,274 $447 7 - - - - - - $668
22,274
kWh
$447
7
kW-months/year
-
-
$
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$4,545,631
Cost:
$1,626,800
$17,429 1,421,161 $11,992 185 $18,000 - $4,210 - $4,494,000 - $17,429
1,421,161
kWh
$11,992
185
kW-months/year
$18,000
-
$
$4,210
-
lb
$4,494,000
-
$
TOTAL IMPLEMENTED Savings:
$914,911
Cost:
$969,200
$6,929 230,950 $4,772 74 - - $4,210 - $899,000 - $6,929
230,950
kWh
$4,772
74
kW-months/year
-
-
$
$4,210
-
lb
$899,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ lb $ $
Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes