IAC logo
IAC Assessment: TN0694
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0694
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 2000
Principal Product laboratory refrigerators, freezers, incubators
NAICS n/a
SIC 3585 - Refrigeration And Heating Equipment
Sales $50,000,000-$100,000,000
# of Employees 435
Plant Area (Sq.Ft.) 267,000
Annual Production 25,000 Pieces
Production Hrs. Annual 6,240
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $227,942 7,664,713 kWh $0.03
Electricity Demand $164,115 14,588 kW-months/year $11.25
TOTAL ENERGY COSTS $596,946
RECOMMENDED SAVINGS* $287,420 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $29,630
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Water Disposal Solid Waste (non-haz) Water Consumption Primary Product Electricity Usage Electricity Demand Electricity Fees Water Disposal Solid Waste (non-haz) Water Consumption Primary Product
$ kWh $ kW-months/year $ $ $ Tgal $ lb $ Tgal $ $
01: 4.721 INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION Savings:
$219,860
Cost:
$100,000
- - - - $5,110 - $2,250 - - - - - $212,500 - -
-
kWh
-
-
kW-months/year
$5,110
-
$
$2,250
-
Tgal
-
-
lb
-
-
Tgal
$212,500
-
$
02: 2.7131 ADD AREA LIGHTING SWITCHES Savings:
$17,510
Cost:
$25,030
$17,510 286,049 - - - - - - - - - - - - $17,510
286,049
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
-
-
lb
-
-
Tgal
-
-
$
03: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$10,755
Cost:
$5,075
$3,365 105,217 $2,295 17 - - - - - - - - $5,095 - $3,365
105,217
kWh
$2,295
17
kW-months/year
-
-
$
-
-
Tgal
-
-
lb
-
-
Tgal
$5,095
-
$
04: 2.7251 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF Savings:
$10,130
Cost:
$181,580
$13,470 220,106 - - - - - - - - $(-3,340) - - - $13,470
220,106
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
-
-
lb
$(-3,340)
-
Tgal
-
-
$
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$8,665
Cost:
$26,260
- - - - $8,665 - - - - - - - - - -
-
kWh
-
-
kW-months/year
$8,665
-
$
-
-
Tgal
-
-
lb
-
-
Tgal
-
-
$
06: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$6,210
Cost:
$18,900
- - $6,210 46 - - - - - - - - - - -
-
kWh
$6,210
46
kW-months/year
-
-
$
-
-
Tgal
-
-
lb
-
-
Tgal
-
-
$
07: 3.6112 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME Savings:
$4,345
Cost:
$9,100
- - - - - - - - $4,345 11,520 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
$4,345
11,520
lb
-
-
Tgal
-
-
$
08: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE Savings:
$3,600
Cost:
$7,000
- - - - - - - - $3,600 3,600 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
$3,600
3,600
lb
-
-
Tgal
-
-
$
09: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$2,795
Cost:
$1,875
$1,595 49,824 $1,080 8 - - - - $120 - - - - - $1,595
49,824
kWh
$1,080
8
kW-months/year
-
-
$
-
-
Tgal
$120
-
lb
-
-
Tgal
-
-
$
10: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$2,185
Cost:
$3,570
$1,465 45,721 $720 32 - - - - - - - - - - $1,465
45,721
kWh
$720
32
kW-months/year
-
-
$
-
-
Tgal
-
-
lb
-
-
Tgal
-
-
$
11: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,365
Cost:
-
$1,365 22,274 - - - - - - - - - - - - $1,365
22,274
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
-
-
lb
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$287,420
Cost:
$378,390
$38,770 729,191 $10,305 103 $13,775 - $2,250 - $8,065 15,120 $(-3,340) - $217,595 - $38,770
729,191
kWh
$10,305
103
kW-months/year
$13,775
-
$
$2,250
-
Tgal
$8,065
15,120
lb
$(-3,340)
-
Tgal
$217,595
-
$
TOTAL IMPLEMENTED Savings:
$29,630
Cost:
$30,105
$22,240 413,540 $2,295 17 - - - - - - - - $5,095 - $22,240
413,540
kWh
$2,295
17
kW-months/year
-
-
$
-
-
Tgal
-
-
lb
-
-
Tgal
$5,095
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ Tgal $ lb $ Tgal $ $
Electricity Usage Electricity Demand Electricity Fees Water Disposal Solid Waste (non-haz) Water Consumption Primary Product Electricity Usage Electricity Demand Electricity Fees Water Disposal Solid Waste (non-haz) Water Consumption Primary Product