IAC logo
IAC Assessment: TP0007
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TP0007
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Prairie View, A&M
Assessment Year 1999
Principal Product Heat Exchanger
NAICS n/a
SIC 3433 - Heating Equipment, Except Electric
Sales $10,000,000-$50,000,000
# of Employees 135
Plant Area (Sq.Ft.) 0
Annual Production 110 Pieces
Production Hrs. Annual 5,151
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $53,846 2,328,839 kWh $0.02
Electricity Demand $44,223 7,002 kW-months/year $6.32
Electricity Fees $6,088 - $ -
Natural Gas $28,208 5,298 MMBtu $5.32
TOTAL ENERGY COSTS $132,365
RECOMMENDED SAVINGS* $22,188 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$9,968
Cost:
$8,500
- - $9,968 810 -
-
kWh
$9,968
810
kW-months/year
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$5,504
Cost:
$20,190
$5,504 305,686 - - $5,504
305,686
kWh
-
-
kW-months/year
03: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$2,254
Cost:
$2,071
$626 34,877 $1,628 132 $626
34,877
kWh
$1,628
132
kW-months/year
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,560
Cost:
$800
$1,560 46,307 - - $1,560
46,307
kWh
-
-
kW-months/year
05: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,425
Cost:
-
- - $2,425 197 -
-
kWh
$2,425
197
kW-months/year
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$177
Cost:
$1,095
$62 3,517 $115 9 $62
3,517
kWh
$115
9
kW-months/year
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$300
Cost:
$987
$300 16,706 - - $300
16,706
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$22,188
Cost:
$33,643
$8,052 407,093 $14,136 1,148 $8,052
407,093
kWh
$14,136
1,148
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand