Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Texas Rio Grande Valley |
---|---|
Assessment Year | 2017 |
Principal Product | Metal Formed Seat Mechanisms |
NAICS | 336360 - Motor Vehicle Seating and Interior Trim Manufacturing |
SIC | 3465 - Automotive Stampings |
Sales | $10,000,000-$50,000,000 |
# of Employees | 86 |
Plant Area (Sq.Ft.) | 100,000 |
Annual Production | 84,000,000 Pieces |
Production Hrs. Annual | 7,296 |
Location (State) | TX |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $197,541 | 2,746,380 | kWh | $0.07 |
Electricity Demand | $25,950 | 6,399 | kW-months/year | $4.06 |
Electricity Fees | $19,533 | - | $ | - |
LPG | $47,024 | 20,760 | MMBtu | $2.27 |
TOTAL ENERGY COSTS | $330,505 | |||
RECOMMENDED SAVINGS* | $200,694 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $183,095 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Fees | Water Disposal | Administrative Changes | Electricity Usage | Electricity Fees | Water Disposal | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $41,044 Cost: $64,592 |
$41,044 | 513,055 | - | - | - | - | - | - |
$41,044 513,055 kWh |
- - $ |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $32,843 Cost: $2,000 |
$32,843 | 410,531 | - | - | - | - | - | - |
$32,843 410,531 kWh |
- - $ |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $3,334 Cost: $14,764 |
$3,334 | 41,664 | - | - | - | - | - | - |
$3,334 41,664 kWh |
- - $ |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 4.812 APPLY FOR INVESTMENT INCENTIVES |
Savings: $74,012 Cost: $15,000 |
- | - | $74,012 | - | - | - | - | - |
- - kWh |
$74,012 - $ |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.4131 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT |
Savings: $24,242 Cost: $38,964 |
- | - | - | - | $24,242 | 43,338 | - | - |
- - kWh |
- - $ |
$24,242 43,338 Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER |
Savings: $14,265 Cost: $449 |
- | - | - | - | - | - | $14,265 | - |
- - kWh |
- - $ |
- - Tgal |
$14,265 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $10,954 Cost: $10,000 |
- | - | - | - | - | - | $10,954 | - |
- - kWh |
- - $ |
- - Tgal |
$10,954 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $200,694 Cost: $145,769 |
$77,221 | 965,250 | $74,012 | - | $24,242 | 43,338 | $25,219 | - | $77,221 965,250 kWh |
$74,012 - $ |
$24,242 43,338 Tgal |
$25,219 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $183,095 Cost: $130,556 |
$73,887 | 923,586 | $74,012 | - | $24,242 | 43,338 | $10,954 | - | $73,887 923,586 kWh |
$74,012 - $ |
$24,242 43,338 Tgal |
$10,954 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Fees | Water Disposal | Administrative Changes | Electricity Usage | Electricity Fees | Water Disposal | Administrative Changes |