Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Texas Rio Grande Valley
Assessment Year 2017
Principal Product Metal Formed Seat Mechanisms
NAICS 336360 - Motor Vehicle Seating and Interior Trim Manufacturing
SIC 3465 - Automotive Stampings
Sales $10,000,000-$50,000,000
# of Employees 86
Plant Area (Sq.Ft.) 100,000
Annual Production 84,000,000 Pieces
Production Hrs. Annual 7,296
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $197,541 2,746,380 kWh $0.07
Electricity Demand $25,950 6,399 kW-months/year $4.06
Electricity Fees $19,533 - $ -
LPG $47,024 20,760 MMBtu $2.27
TOTAL ENERGY COSTS $330,505
RECOMMENDED SAVINGS* $200,694 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $183,095
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Water Disposal Administrative Changes Electricity Usage Electricity Fees Water Disposal Administrative Changes
$ kWh $ $ $ Tgal $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$41,044
Cost:
$64,592
$41,044 513,055 - - - - - - $41,044
513,055
kWh
-
-
$
-
-
Tgal
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$32,843
Cost:
$2,000
$32,843 410,531 - - - - - - $32,843
410,531
kWh
-
-
$
-
-
Tgal
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,334
Cost:
$14,764
$3,334 41,664 - - - - - - $3,334
41,664
kWh
-
-
$
-
-
Tgal
-
-
$
04: 4.812 APPLY FOR INVESTMENT INCENTIVES Savings:
$74,012
Cost:
$15,000
- - $74,012 - - - - - -
-
kWh
$74,012
-
$
-
-
Tgal
-
-
$
05: 3.4131 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT Savings:
$24,242
Cost:
$38,964
- - - - $24,242 43,338 - - -
-
kWh
-
-
$
$24,242
43,338
Tgal
-
-
$
06: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$14,265
Cost:
$449
- - - - - - $14,265 - -
-
kWh
-
-
$
-
-
Tgal
$14,265
-
$
07: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$10,954
Cost:
$10,000
- - - - - - $10,954 - -
-
kWh
-
-
$
-
-
Tgal
$10,954
-
$
TOTAL RECOMMENDED Savings:
$200,694
Cost:
$145,769
$77,221 965,250 $74,012 - $24,242 43,338 $25,219 - $77,221
965,250
kWh
$74,012
-
$
$24,242
43,338
Tgal
$25,219
-
$
TOTAL IMPLEMENTED Savings:
$183,095
Cost:
$130,556
$73,887 923,586 $74,012 - $24,242 43,338 $10,954 - $73,887
923,586
kWh
$74,012
-
$
$24,242
43,338
Tgal
$10,954
-
$
Savings
Cost
$ kWh $ $ $ Tgal $ $
Electricity Usage Electricity Fees Water Disposal Administrative Changes Electricity Usage Electricity Fees Water Disposal Administrative Changes