IAC logo
IAC Assessment: TR0018
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TR0018
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Texas Rio Grande Valley
Assessment Year 2019
Principal Product Sewarage treatment
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $1,000,000-$5,000,000
# of Employees 6
Plant Area (Sq.Ft.) 994,816
Annual Production 1,916,250 Thousand Gallons
Production Hrs. Annual 8,544
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $138,061 3,487,440 kWh $0.04
Electricity Demand $76,947 7,420 kW-months/year $10.37
Electricity Fees $6,483 - $ -
TOTAL ENERGY COSTS $221,491
RECOMMENDED SAVINGS* $25,656 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,991
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes
$ kWh $ kW-months/year $ $
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$11,196
Cost:
$14,000
- - $11,196 1,079 - - -
-
kWh
$11,196
1,079
kW-months/year
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,055
Cost:
$1,825
$2,231 56,493 $823 79 - - $2,231
56,493
kWh
$823
79
kW-months/year
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,937
Cost:
$6,050
$2,841 71,916 $2,096 202 - - $2,841
71,916
kWh
$2,096
202
kW-months/year
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,038
Cost:
$308
$132 3,336 $47 5 $858 - $132
3,336
kWh
$47
5
kW-months/year
$858
-
$
05: 2.4311 RECOVER MECHANICAL ENERGY Savings:
$5,431
Cost:
$25,000
$5,431 137,493 - - - - $5,431
137,493
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$25,656
Cost:
$47,183
$10,635 269,238 $14,163 1,365 $858 - $10,635
269,238
kWh
$14,163
1,365
kW-months/year
$858
-
$
TOTAL IMPLEMENTED Savings:
$7,991
Cost:
$7,875
$5,072 128,409 $2,919 281 - - $5,072
128,409
kWh
$2,919
281
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes