IAC Assessment: TT0037
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0037
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2009
Principal Product Hadwood Flooring
NAICS 321918 - Other Millwork (including Flooring)
SIC 2426 - Hardwood Dimension & Flooring Mills
Sales $50,000,000-$100,000,000
# of Employees 450
Plant Area (Sq.Ft.) 110,000
Annual Production 30,000,000 Units
Production Hrs. Annual 6,240
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $772,343 19,364,517 kWh $0.04
Electricity Demand $465,094 52,808 kW-months/year $8.81
Electricity Fees $198,987 - $ -
Natural Gas $31,482 2,367 MMBtu $13.30
TOTAL ENERGY COSTS $1,467,906
RECOMMENDED SAVINGS* $258,760 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,750
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$150,000
Cost:
$300,000
$150,000 1,923,720 - - - - $150,000
1,923,720
kWh
-
-
kW-months/year
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$51,800
Cost:
$70,235
$42,800 576,876 $1,120 925 $7,880 - $42,800
576,876
kWh
$1,120
925
kW-months/year
$7,880
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$36,040
Cost:
$97,150
$28,370 382,337 $740 613 $6,930 - $28,370
382,337
kWh
$740
613
kW-months/year
$6,930
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,090
Cost:
$6,225
$5,220 70,395 $140 113 $730 - $5,220
70,395
kWh
$140
113
kW-months/year
$730
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,080
Cost:
$8,270
$3,030 40,884 $80 66 $970 - $3,030
40,884
kWh
$80
66
kW-months/year
$970
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$10,750
Cost:
$2,900
$10,750 124,220 - - - - $10,750
124,220
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$258,760
Cost:
$484,780
$240,170 3,118,432 $2,080 1,717 $16,510 - $240,170
3,118,432
kWh
$2,080
1,717
kW-months/year
$16,510
-
$
TOTAL IMPLEMENTED Savings:
$10,750
Cost:
$2,900
$10,750 124,220 - - - - $10,750
124,220
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes