IAC logo
IAC Assessment: TT0041
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0041
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2009
Principal Product Frozen Dough
NAICS 311412 - Frozen Specialty Food Manufacturing
SIC 2038 - Frozen Specialties, Nec
Sales $100,000,000-$500,000,000
# of Employees 350
Plant Area (Sq.Ft.) 250,000
Annual Production 257,000 Pounds
Production Hrs. Annual 8,760
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,835,656 37,759,800 kWh $0.05
Electricity Demand $937,961 83,153 kW-months/year $11.28
Electricity Fees $43,810 - $ -
LPG $183,962 15,565 MMBtu $11.82
TOTAL ENERGY COSTS $3,001,389
RECOMMENDED SAVINGS* $90,808 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $45,883
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$1,330
Cost:
-
$1,330 16,620 - - $1,330
16,620
kWh
-
-
kW-months/year
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$25,865
Cost:
-
$18,975 254,305 $6,890 612 $18,975
254,305
kWh
$6,890
612
kW-months/year
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$31,503
Cost:
-
$23,126 310,000 $8,377 744 $23,126
310,000
kWh
$8,377
744
kW-months/year
04: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$9,530
Cost:
-
$9,530 148,284 - - $9,530
148,284
kWh
-
-
kW-months/year
05: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$9,530
Cost:
-
$9,530 148,284 - - $9,530
148,284
kWh
-
-
kW-months/year
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,050
Cost:
-
$8,730 279,130 $4,320 - $8,730
279,130
kWh
$4,320
-
kW-months/year
TOTAL RECOMMENDED Savings:
$90,808
Cost:
-
$71,221 1,156,623 $19,587 1,356 $71,221
1,156,623
kWh
$19,587
1,356
kW-months/year
TOTAL IMPLEMENTED Savings:
$45,883
Cost:
-
$33,186 605,750 $12,697 744 $33,186
605,750
kWh
$12,697
744
kW-months/year