Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Tennessee Technological University |
---|---|
Assessment Year | 2009 |
Principal Product | Manufactured Homes |
NAICS | 321991 - Manufactured Home (Mobile Home) Manufacturing |
SIC | 2451 - Mobile Homes |
Sales | $10,000,000-$50,000,000 |
# of Employees | 117 |
Plant Area (Sq.Ft.) | 150,000 |
Annual Production | 240 Pieces |
Production Hrs. Annual | 2,000 |
Location (State) | TN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $165,699 | 1,841,101 | kWh | $0.09 |
Electricity Demand | $65,297 | 8,847 | kW-months/year | $7.38 |
LPG | $248,316 | 11,166 | MMBtu | $22.24 |
TOTAL ENERGY COSTS | $480,723 | |||
RECOMMENDED SAVINGS* | $379,511 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $158,522 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | LPG | Electricity Usage | Natural Gas | LPG | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1336 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL |
Savings: $100,429 Cost: $34,284 |
- | - | - | - | $100,429 | 4,515 |
- - kWh |
- - MMBtu |
$100,429 4,515 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.5111 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS |
Savings: $24,604 Cost: $76,000 |
- | - | - | - | $24,604 | 1,104 |
- - kWh |
- - MMBtu |
$24,604 1,104 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT |
Savings: $13,478 Cost: $55,000 |
$13,478 | 149,760 | - | - | - | - |
$13,478 149,760 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $9,434 Cost: $45,960 |
$9,434 | 104,832 | - | - | - | - |
$9,434 104,832 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $48,659 Cost: $64,000 |
- | - | - | - | $48,659 | 2,183 |
- - kWh |
- - MMBtu |
$48,659 2,183 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1332 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS |
Savings: $182,907 Cost: - |
- | - | $(-65,559) | (-9,466) | $248,466 | 11,165 |
- - kWh |
$(-65,559) (-9,466) MMBtu |
$248,466 11,165 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $379,511 Cost: $275,244 |
$22,912 | 254,592 | $(-65,559) | (-9,466) | $422,158 | 18,967 | $22,912 254,592 kWh |
$(-65,559) (-9,466) MMBtu |
$422,158 18,967 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $158,522 Cost: $144,244 |
$9,434 | 104,832 | - | - | $149,088 | 6,698 | $9,434 104,832 kWh |
- - MMBtu |
$149,088 6,698 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | LPG | Electricity Usage | Natural Gas | LPG |