IAC logo
IAC Assessment: TT0056
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0056
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2010
Principal Product Tungsten Carbide Inserts
NAICS 333517 - Machine Tool Manufacturing
SIC 3541 - Machine Tools, Metal Cutting Types
Sales <$500,000
# of Employees 1
Plant Area (Sq.Ft.) 40,000
Annual Production 1 Units
Production Hrs. Annual 1
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,048,899 14,552,320 kWh $0.07
Natural Gas $11,563 1,326 MMBtu $8.72
TOTAL ENERGY COSTS $1,145,703
RECOMMENDED SAVINGS* $41,876 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,872
Cost:
$11,208
$2,872 41,000 $2,872
41,000
kWh
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,661
Cost:
$45,225
$10,661 118,456 $10,661
118,456
kWh
03: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$8,445
Cost:
$1,444
$8,445 120,647 $8,445
120,647
kWh
04: 2.7145 INSTALL SKYLIGHTS Savings:
$16,932
Cost:
$88,000
$16,932 188,136 $16,932
188,136
kWh
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,966
Cost:
$21,900
$2,966 42,378 $2,966
42,378
kWh
TOTAL RECOMMENDED Savings:
$41,876
Cost:
$167,777
$41,876 510,617 $41,876
510,617
kWh
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - -
-
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage