IAC Assessment: TT0124
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0124
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2014
Principal Product HVAC Units
NAICS 333415 - Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
SIC 3585 - Refrigeration And Heating Equipment
Sales $100,000,000-$500,000,000
# of Employees 1,750
Plant Area (Sq.Ft.) 700,000
Annual Production 53,300 Units
Production Hrs. Annual 8,760
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,005,986 25,288,189 kWh $0.04
Electricity Demand $673,956 51,842 kW-months/year $13.00
Electricity Fees $115,697 - $ -
Natural Gas $363,160 71,557 MMBtu $5.08
TOTAL ENERGY COSTS $2,352,264
RECOMMENDED SAVINGS* $134,095 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $134,095
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$16,604
Cost:
$5,500
$11,495 287,398 $5,109 393 $11,495
287,398
kWh
$5,109
393
kW-months/year
02: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$103,306
Cost:
$10,000
$71,482 1,787,040 $31,824 2,448 $71,482
1,787,040
kWh
$31,824
2,448
kW-months/year
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$10,755
Cost:
$100
$7,442 186,045 $3,313 255 $7,442
186,045
kWh
$3,313
255
kW-months/year
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,486
Cost:
$9,660
$1,105 27,628 $1,381 106 $1,105
27,628
kWh
$1,381
106
kW-months/year
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$326
Cost:
$50
$225 5,629 $101 8 $225
5,629
kWh
$101
8
kW-months/year
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$618
Cost:
$2,285
$426 10,652 $192 15 $426
10,652
kWh
$192
15
kW-months/year
TOTAL RECOMMENDED Savings:
$134,095
Cost:
$27,595
$92,175 2,304,392 $41,920 3,225 $92,175
2,304,392
kWh
$41,920
3,225
kW-months/year
TOTAL IMPLEMENTED Savings:
$134,095
Cost:
$27,595
$92,175 2,304,392 $41,920 3,225 $92,175
2,304,392
kWh
$41,920
3,225
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand