IAC Assessment: TT0158
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0158
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2015
Principal Product Commercial Laundry
NAICS 333318 - Other Commercial and Service Industry Machinery Manufacturing
SIC 3582 - Commercial Laundry Equipment
Sales $5,000,000-$10,000,000
# of Employees 82
Plant Area (Sq.Ft.) 55,000
Annual Production 4,784,000 Pounds
Production Hrs. Annual 3,224
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $64,403 633,800 kWh $0.10
Electricity Demand $13,153 2,968 kW-months/year $4.43
Natural Gas $95,765 13,129 MMBtu $7.29
TOTAL ENERGY COSTS $173,321
RECOMMENDED SAVINGS* $30,491 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,934
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$15,995
Cost:
$50,374
$10,368 102,044 $5,627 375 - - $10,368
102,044
kWh
$5,627
375
kW-months/year
-
-
MMBtu
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$4,934
Cost:
$7,361
- - - - $4,934 677 -
-
kWh
-
-
kW-months/year
$4,934
677
MMBtu
03: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$4,000
Cost:
$150
- - - - $4,000 548 -
-
kWh
-
-
kW-months/year
$4,000
548
MMBtu
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$2,406
Cost:
$5,000
- - - - $2,406 330 -
-
kWh
-
-
kW-months/year
$2,406
330
MMBtu
05: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$2,256
Cost:
$400
- - - - $2,256 309 -
-
kWh
-
-
kW-months/year
$2,256
309
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$761
Cost:
$1,000
$491 4,836 $270 18 - - $491
4,836
kWh
$270
18
kW-months/year
-
-
MMBtu
07: 2.7122 DISCONNECT BALLASTS Savings:
$139
Cost:
$139
$116 1,138 $23 2 - - $116
1,138
kWh
$23
2
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$30,491
Cost:
$64,424
$10,975 108,018 $5,920 395 $13,596 1,864 $10,975
108,018
kWh
$5,920
395
kW-months/year
$13,596
1,864
MMBtu
TOTAL IMPLEMENTED Savings:
$4,934
Cost:
$7,361
- - - - $4,934 677 -
-
kWh
-
-
kW-months/year
$4,934
677
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas