IAC Assessment: TT0159
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0159
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2015
Principal Product Bimetallic Wire
NAICS 331420 - Copper Rolling, Drawing, Extruding, and Alloying
SIC 3351 - Copper Rolling And Drawing
Sales $100,000,000-$500,000,000
# of Employees 100
Plant Area (Sq.Ft.) 287,000
Annual Production 40,000,000 Pounds
Production Hrs. Annual 8,064
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,092,383 28,292,240 kWh $0.04
Electricity Demand $870,133 62,696 kW-months/year $13.88
Natural Gas $226,832 20,622 MMBtu $11.00
TOTAL ENERGY COSTS $2,189,348
RECOMMENDED SAVINGS* $93,208 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $36,826
#|Description Savings
Cost
Status Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$31,644
Cost:
$3,000
$20,703 536,368 $10,941 788 - - $20,703
536,368
kWh
$10,941
788
kW-months/year
-
-
$
02: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$19,647
Cost:
$20,000
$14,651 379,560 $4,996 360 - - $14,651
379,560
kWh
$4,996
360
kW-months/year
-
-
$
03: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$17,175
Cost:
$38,170
$7,175 185,880 - - $10,000 - $7,175
185,880
kWh
-
-
kW-months/year
$10,000
-
$
04: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$8,659
Cost:
$700
$4,183 108,380 $4,476 323 - - $4,183
108,380
kWh
$4,476
323
kW-months/year
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,329
Cost:
$63
$3,469 89,859 $1,860 134 - - $3,469
89,859
kWh
$1,860
134
kW-months/year
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,756
Cost:
$7,500
$3,756 97,307 - - - - $3,756
97,307
kWh
-
-
kW-months/year
-
-
$
07: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$2,995
Cost:
$1,070
$2,995 77,583 - - - - $2,995
77,583
kWh
-
-
kW-months/year
-
-
$
08: 2.7228 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM Savings:
$2,187
Cost:
$500
$2,187 56,646 - - - - $2,187
56,646
kWh
-
-
kW-months/year
-
-
$
09: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$1,816
Cost:
$1,000
$1,183 30,643 $633 46 - - $1,183
30,643
kWh
$633
46
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$93,208
Cost:
$72,003
$60,302 1,562,226 $22,906 1,651 $10,000 - $60,302
1,562,226
kWh
$22,906
1,651
kW-months/year
$10,000
-
$
TOTAL IMPLEMENTED Savings:
$36,826
Cost:
$4,570
$25,885 670,597 $10,941 788 - - $25,885
670,597
kWh
$10,941
788
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost