IAC Assessment: TT0165
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0165
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2016
Principal Product Ceramic Microelectronics
NAICS 334419 - Other Electronic Component Manufacturing
SIC 3087 - Custom Compound Purchased Resins
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 130,000
Annual Production 6,200,000 Pieces
Production Hrs. Annual 4,680
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $369,700 6,423,600 kWh $0.06
Electricity Demand $191,972 12,788 kW-months/year $15.01
Natural Gas $66,900 9,987 MMBtu $6.70
TOTAL ENERGY COSTS $728,889
RECOMMENDED SAVINGS* $75,451 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $41,941
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Water Consumption
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ Tgal
01: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$33,510
Cost:
$75,000
$24,743 426,612 $8,767 584 - - - - - - - - $24,743
426,612
kWh
$8,767
584
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
Tgal
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$30,405
Cost:
$88,306
$18,285 315,263 $12,120 808 - - - - - - - - $18,285
315,263
kWh
$12,120
808
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
Tgal
03: 2.1242 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT Savings:
$4,033
Cost:
$3,600
- - - - $1,000 149 $1,854 337 $1,179 336,960 - - -
-
kWh
-
-
kW-months/year
$1,000
149
MMBtu
$1,854
337
Tgal
$1,179
336,960
gal
-
-
Tgal
04: 2.1212 OPERATE BOILERS ON HIGH FIRE SETTING Savings:
$4,000
Cost:
$12,000
- - - - $2,000 300 $1,222 222 - - $778 - -
-
kWh
-
-
kW-months/year
$2,000
300
MMBtu
$1,222
222
Tgal
-
-
gal
$778
-
Tgal
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,310
Cost:
$1,919
$1,556 26,800 - - $754 92 - - - - - - $1,556
26,800
kWh
-
-
kW-months/year
$754
92
MMBtu
-
-
Tgal
-
-
gal
-
-
Tgal
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$883
Cost:
$1,500
$538 9,283 $345 23 - - - - - - - - $538
9,283
kWh
$345
23
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
Tgal
07: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$310
Cost:
$200
$229 3,942 $81 5 - - - - - - - - $229
3,942
kWh
$81
5
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
Tgal
TOTAL RECOMMENDED Savings:
$75,451
Cost:
$182,525
$45,351 781,900 $21,313 1,420 $3,754 541 $3,076 559 $1,179 336,960 $778 - $45,351
781,900
kWh
$21,313
1,420
kW-months/year
$3,754
541
MMBtu
$3,076
559
Tgal
$1,179
336,960
gal
$778
-
Tgal
TOTAL IMPLEMENTED Savings:
$41,941
Cost:
$107,525
$20,608 355,288 $12,546 836 $3,754 541 $3,076 559 $1,179 336,960 $778 - $20,608
355,288
kWh
$12,546
836
kW-months/year
$3,754
541
MMBtu
$3,076
559
Tgal
$1,179
336,960
gal
$778
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Water Consumption