IAC Assessment: TT0179
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0179
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2016
Principal Product Medical Implants
NAICS 339113 - Surgical Appliance and Supplies Manufacturing
SIC 3842 - Surgical Appliances And Supplies
Sales $10,000,000-$50,000,000
# of Employees 70
Plant Area (Sq.Ft.) 32,000
Annual Production 267,464 Units
Production Hrs. Annual 7,488
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $200,559 3,327,600 kWh $0.06
Electricity Demand $103,421 9,788 kW-months/year $10.57
Natural Gas $3,412 445 MMBtu $7.66
TOTAL ENERGY COSTS $307,392
RECOMMENDED SAVINGS* $32,119 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,211
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,880
Cost:
$54,314
$9,260 154,340 $284 27 - - $2,336 - $9,260
154,340
kWh
$284
27
kW-months/year
-
-
MMBtu
$2,336
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$6,035
Cost:
-
$6,035 100,586 - - - - - - $6,035
100,586
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES Savings:
$5,391
Cost:
-
$5,391 89,856 - - - - - - $5,391
89,856
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,217
Cost:
-
$4,217 70,297 - - - - - - $4,217
70,297
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$1,568
Cost:
$4,800
$1,568 26,130 - - - - - - $1,568
26,130
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$1,325
Cost:
-
- - - - $1,325 173 - - -
-
kWh
-
-
kW-months/year
$1,325
173
MMBtu
-
-
$
07: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$802
Cost:
$2,000
$802 13,362 - - - - - - $802
13,362
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
08: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$415
Cost:
$1,064
$320 5,335 $95 9 - - - - $320
5,335
kWh
$95
9
kW-months/year
-
-
MMBtu
-
-
$
09: 2.4113 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS Savings:
$319
Cost:
$421
$319 5,323 - - - - - - $319
5,323
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$167
Cost:
$195
$80 1,328 $2 0 - - $85 - $80
1,328
kWh
$2
0
kW-months/year
-
-
MMBtu
$85
-
$
TOTAL RECOMMENDED Savings:
$32,119
Cost:
$62,794
$27,992 466,557 $381 36 $1,325 173 $2,421 - $27,992
466,557
kWh
$381
36
kW-months/year
$1,325
173
MMBtu
$2,421
-
$
TOTAL IMPLEMENTED Savings:
$17,211
Cost:
$4,800
$17,211 286,869 - - - - - - $17,211
286,869
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes