IAC Assessment: TT0201
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0201
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2017
Principal Product Solid Wood Flooring
NAICS 321918 - Other Millwork (including Flooring)
SIC 2426 - Hardwood Dimension & Flooring Mills
Sales $50,000,000-$100,000,000
# of Employees 219
Plant Area (Sq.Ft.) 344,130
Annual Production 1,680 Units
Production Hrs. Annual 4,000
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $700,159 17,560,408 kWh $0.04
Electricity Demand $387,881 36,356 kW-months/year $10.67
Natural Gas $12,193 1,467 MMBtu $8.31
TOTAL ENERGY COSTS $1,104,675
RECOMMENDED SAVINGS* $602,307 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.3414 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT Savings:
$339,254
Cost:
$1,500,000
$371,424 9,285,600 $135,722 12,720 - - $(-50,000) - $(-117,892) - $371,424
9,285,600
kWh
$135,722
12,720
kW-months/year
-
-
MMBtu
$(-50,000)
-
$
$(-117,892)
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$130,717
Cost:
$332,125
$84,458 2,114,904 $23,761 2,227 - - $22,498 - - - $84,458
2,114,904
kWh
$23,761
2,227
kW-months/year
-
-
MMBtu
$22,498
-
$
-
-
$
03: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$36,301
Cost:
$12,000
- - - - - - - - $36,301 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$36,301
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$26,588
Cost:
$126,000
$26,588 664,686 - - - - - - - - $26,588
664,686
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$19,888
Cost:
$10,000
- - - - - - - - $19,888 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$19,888
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$13,682
Cost:
$26,000
$6,518 162,944 $7,164 672 - - - - - - $6,518
162,944
kWh
$7,164
672
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$12,087
Cost:
$360
$11,585 289,620 $502 47 - - - - - - $11,585
289,620
kWh
$502
47
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,271
Cost:
$3,000
$8,271 206,784 - - - - - - - - $8,271
206,784
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,818
Cost:
$23,900
$3,529 88,213 $1,289 121 - - - - - - $3,529
88,213
kWh
$1,289
121
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
10: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$3,329
Cost:
$15,000
- - - - - - - - $3,329 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$3,329
-
$
11: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$3,298
Cost:
$8,481
$1,864 46,600 $1,434 134 - - - - - - $1,864
46,600
kWh
$1,434
134
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
12: 2.1121 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING Savings:
$2,035
Cost:
$1,000
- - - - $2,035 245 - - - - -
-
kWh
-
-
kW-months/year
$2,035
245
MMBtu
-
-
$
-
-
$
13: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,150
Cost:
$3,500
$1,150 28,741 - - - - - - - - $1,150
28,741
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
14: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$802
Cost:
$1,700
$567 14,175 $235 22 - - - - - - $567
14,175
kWh
$235
22
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
15: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$87
Cost:
$100
$87 2,176 - - - - - - - - $87
2,176
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$602,307
Cost:
$2,063,166
$516,041 12,904,443 $170,107 15,943 $2,035 245 $(-27,502) - $(-58,374) - $516,041
12,904,443
kWh
$170,107
15,943
kW-months/year
$2,035
245
MMBtu
$(-27,502)
-
$
$(-58,374)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost