Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Tennessee Technological University |
---|---|
Assessment Year | 2017 |
Principal Product | Solid Wood Flooring |
NAICS | 321918 - Other Millwork (including Flooring) |
SIC | 2426 - Hardwood Dimension & Flooring Mills |
Sales | $50,000,000-$100,000,000 |
# of Employees | 219 |
Plant Area (Sq.Ft.) | 344,130 |
Annual Production | 1,680 Units |
Production Hrs. Annual | 4,000 |
Location (State) | TN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $700,159 | 17,560,408 | kWh | $0.04 |
Electricity Demand | $387,881 | 36,356 | kW-months/year | $10.67 |
Natural Gas | $12,193 | 1,467 | MMBtu | $8.31 |
TOTAL ENERGY COSTS | $1,104,675 | |||
RECOMMENDED SAVINGS* | $602,307 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3414 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT |
Savings: $339,254 Cost: $1,500,000 |
$371,424 | 9,285,600 | $135,722 | 12,720 | - | - | $(-50,000) | - | $(-117,892) | - |
$371,424 9,285,600 kWh |
$135,722 12,720 kW-months/year |
- - MMBtu |
$(-50,000) - $ |
$(-117,892) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $130,717 Cost: $332,125 |
$84,458 | 2,114,904 | $23,761 | 2,227 | - | - | $22,498 | - | - | - |
$84,458 2,114,904 kWh |
$23,761 2,227 kW-months/year |
- - MMBtu |
$22,498 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED |
Savings: $36,301 Cost: $12,000 |
- | - | - | - | - | - | - | - | $36,301 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
$36,301 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $26,588 Cost: $126,000 |
$26,588 | 664,686 | - | - | - | - | - | - | - | - |
$26,588 664,686 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $19,888 Cost: $10,000 |
- | - | - | - | - | - | - | - | $19,888 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
$19,888 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $13,682 Cost: $26,000 |
$6,518 | 162,944 | $7,164 | 672 | - | - | - | - | - | - |
$6,518 162,944 kWh |
$7,164 672 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4321 UPGRADE OBSOLETE EQUIPMENT |
Savings: $12,087 Cost: $360 |
$11,585 | 289,620 | $502 | 47 | - | - | - | - | - | - |
$11,585 289,620 kWh |
$502 47 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $8,271 Cost: $3,000 |
$8,271 | 206,784 | - | - | - | - | - | - | - | - |
$8,271 206,784 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $4,818 Cost: $23,900 |
$3,529 | 88,213 | $1,289 | 121 | - | - | - | - | - | - |
$3,529 88,213 kWh |
$1,289 121 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER |
Savings: $3,329 Cost: $15,000 |
- | - | - | - | - | - | - | - | $3,329 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
$3,329 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $3,298 Cost: $8,481 |
$1,864 | 46,600 | $1,434 | 134 | - | - | - | - | - | - |
$1,864 46,600 kWh |
$1,434 134 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.1121 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING |
Savings: $2,035 Cost: $1,000 |
- | - | - | - | $2,035 | 245 | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,035 245 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $1,150 Cost: $3,500 |
$1,150 | 28,741 | - | - | - | - | - | - | - | - |
$1,150 28,741 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $802 Cost: $1,700 |
$567 | 14,175 | $235 | 22 | - | - | - | - | - | - |
$567 14,175 kWh |
$235 22 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
15: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $87 Cost: $100 |
$87 | 2,176 | - | - | - | - | - | - | - | - |
$87 2,176 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $602,307 Cost: $2,063,166 |
$516,041 | 12,904,443 | $170,107 | 15,943 | $2,035 | 245 | $(-27,502) | - | $(-58,374) | - | $516,041 12,904,443 kWh |
$170,107 15,943 kW-months/year |
$2,035 245 MMBtu |
$(-27,502) - $ |
$(-58,374) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Ancillary Material Cost |