IAC logo
IAC Assessment: TT0211
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0211
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2018
Principal Product Electricity Generation
NAICS 221112 - Fossil Fuel Electric Power Generation
SIC 4911 - Electric Services
Sales $100,000,000-$500,000,000
# of Employees 50
Plant Area (Sq.Ft.) 10,000
Annual Production 5,455,700 Units
Production Hrs. Annual 8,760
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $9,499,880 146,152,000 kWh $0.07
Natural Gas $98,641,446 32,880,482 MMBtu $3.00
TOTAL ENERGY COSTS $108,141,326
RECOMMENDED SAVINGS* $481,547 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $128,212
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2127 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM Savings:
$115,103
Cost:
$150,000
$115,103 1,770,800 - - $115,103
1,770,800
kWh
-
-
MMBtu
02: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$96,921
Cost:
$15,000
$96,921 1,491,100 - - $96,921
1,491,100
kWh
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$89,245
Cost:
$600,000
$89,245 1,373,000 - - $89,245
1,373,000
kWh
-
-
MMBtu
04: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$73,737
Cost:
$75,000
$81,315 1,251,000 $(-7,578) 2,526 $81,315
1,251,000
kWh
$(-7,578)
2,526
MMBtu
05: 2.2211 USE OPTIMUM TEMPERATURE Savings:
$67,812
Cost:
$300,000
- - $67,812 22,604 -
-
kWh
$67,812
22,604
MMBtu
06: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$25,620
Cost:
$100
$25,620 394,200 - - $25,620
394,200
kWh
-
-
MMBtu
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$13,109
Cost:
$3,750
$13,109 201,700 - - $13,109
201,700
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$481,547
Cost:
$1,143,850
$421,313 6,481,800 $60,234 25,130 $421,313
6,481,800
kWh
$60,234
25,130
MMBtu
TOTAL IMPLEMENTED Savings:
$128,212
Cost:
$153,750
$128,212 1,972,500 - - $128,212
1,972,500
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas