Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Tennessee Technological University |
---|---|
Assessment Year | 2019 |
Principal Product | Electrical Connectors |
NAICS | 334417 - Electronic Connector Manufacturing |
SIC | 3694 - Engine Electrical Equipment |
Sales | $10,000,000-$50,000,000 |
# of Employees | 250 |
Plant Area (Sq.Ft.) | 80,000 |
Annual Production | 13,200,000 Pieces |
Production Hrs. Annual | 6,888 |
Location (State) | TN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $259,630 | 3,969,600 | kWh | $0.07 |
Electricity Demand | $78,050 | 9,611 | kW-months/year | $8.12 |
Natural Gas | $8,686 | 1,048 | MMBtu | $8.29 |
TOTAL ENERGY COSTS | $359,900 | |||
RECOMMENDED SAVINGS* | $94,067 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $61,196 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Water Disposal | Administrative Changes | Electricity Usage | Electricity Demand | Water Disposal | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.812 APPLY FOR INVESTMENT INCENTIVES |
Savings: $61,196 Cost: $11,500 |
- | - | - | - | - | - | $61,196 | - |
- - kWh |
- - kW-months/year |
- - Tgal |
$61,196 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $24,037 Cost: $53,169 |
$19,702 | 301,260 | $4,335 | 534 | - | - | - | - |
$19,702 301,260 kWh |
$4,335 534 kW-months/year |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $6,576 Cost: $3,500 |
$5,485 | 83,866 | $1,091 | 134 | - | - | - | - |
$5,485 83,866 kWh |
$1,091 134 kW-months/year |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $1,140 Cost: $3,390 |
$937 | 14,330 | $203 | 25 | - | - | - | - |
$937 14,330 kWh |
$203 25 kW-months/year |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) |
Savings: $1,118 Cost: $1,900 |
- | - | - | - | $1,118 | 221 | - | - |
- - kWh |
- - kW-months/year |
$1,118 221 Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $94,067 Cost: $73,459 |
$26,124 | 399,456 | $5,629 | 693 | $1,118 | 221 | $61,196 | - | $26,124 399,456 kWh |
$5,629 693 kW-months/year |
$1,118 221 Tgal |
$61,196 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $61,196 Cost: $11,500 |
- | - | - | - | - | - | $61,196 | - | - - kWh |
- - kW-months/year |
- - Tgal |
$61,196 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Water Disposal | Administrative Changes | Electricity Usage | Electricity Demand | Water Disposal | Administrative Changes |