Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Tennessee Technological University |
---|---|
Assessment Year | 2019 |
Principal Product | Ductile Iron Castings |
NAICS | 331511 - Iron Foundries |
SIC | 3325 - Steel Foundries, Nec |
Sales | $100,000,000-$500,000,000 |
# of Employees | 550 |
Plant Area (Sq.Ft.) | 400,000 |
Annual Production | 264 Tons |
Production Hrs. Annual | 6,000 |
Location (State) | TN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $3,867,501 | 93,676,300 | kWh | $0.04 |
Electricity Demand | $2,209,191 | 191,827 | kW-months/year | $11.52 |
Electricity Fees | $293,595 | - | $ | - |
Natural Gas | $1,261,711 | 201,825 | MMBtu | $6.25 |
Other Energy | $13,188,000 | 637,420 | MMBtu | $20.69 |
TOTAL ENERGY COSTS | $20,981,882 | |||
RECOMMENDED SAVINGS* | $1,236,404 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $22,619 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Energy | Electricity Usage | Electricity Demand | Natural Gas | Other Energy | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7273 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM |
Savings: $1,033,923 Cost: $50,000 |
$(-17,292) | (-418,692) | $(-9,695) | (-842) | - | - | $1,060,910 | 51,277 |
$(-17,292) (-418,692) kWh |
$(-9,695) (-842) kW-months/year |
- - MMBtu |
$1,060,910 51,277 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY |
Savings: $111,520 Cost: $54,000 |
$71,585 | 1,733,337 | $39,935 | 3,467 | - | - | - | - |
$71,585 1,733,337 kWh |
$39,935 3,467 kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $31,634 Cost: $2,200 |
- | - | - | - | - | - | $31,634 | 1,529 |
- - kWh |
- - kW-months/year |
- - MMBtu |
$31,634 1,529 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4321 UPGRADE OBSOLETE EQUIPMENT |
Savings: $24,351 Cost: $64,000 |
$257 | 6,214 | $(-206) | (-18) | $24,300 | 3,888 | - | - |
$257 6,214 kWh |
$(-206) (-18) kW-months/year |
$24,300 3,888 MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $18,879 Cost: $82,992 |
$13,662 | 330,806 | $5,217 | 453 | - | - | - | - |
$13,662 330,806 kWh |
$5,217 453 kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $7,163 Cost: $30,000 |
$5,449 | 131,936 | $1,714 | 149 | - | - | - | - |
$5,449 131,936 kWh |
$1,714 149 kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $5,194 Cost: $4,515 |
$5,194 | 125,757 | - | - | - | - | - | - |
$5,194 125,757 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,740 Cost: $2,000 |
$3,740 | 90,565 | - | - | - | - | - | - |
$3,740 90,565 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $1,236,404 Cost: $289,707 |
$82,595 | 1,999,923 | $36,965 | 3,208 | $24,300 | 3,888 | $1,092,544 | 52,806 | $82,595 1,999,923 kWh |
$36,965 3,208 kW-months/year |
$24,300 3,888 MMBtu |
$1,092,544 52,806 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $22,619 Cost: $84,992 |
$17,402 | 421,371 | $5,217 | 453 | - | - | - | - | $17,402 421,371 kWh |
$5,217 453 kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||