IAC logo
IAC Assessment: UA0010
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UA0010
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2007
Principal Product Trash Compactors
NAICS 332420 - Metal Tank (Heavy Gauge) Manufacturing
SIC 3569 - General Industrial Machinery, Nec
Sales $50,000,000-$100,000,000
# of Employees 308
Plant Area (Sq.Ft.) 159,600
Annual Production 4,212 Pieces
Production Hrs. Annual 2,250
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $336,700 4,371,053 kWh $0.08
Electricity Demand $5,754 16,786 kW-months/year $0.34
Natural Gas $138,197 11,262 MMBtu $12.27
TOTAL ENERGY COSTS $480,651
RECOMMENDED SAVINGS* $20,056 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,314
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,084
Cost:
$70,481
$14,083 182,827 $1 975 $14,083
182,827
kWh
$1
975
kW-months/year
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,004
Cost:
$14,292
$2,003 26,008 $1 125 $2,003
26,008
kWh
$1
125
kW-months/year
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$742
Cost:
-
$742 9,639 - - $742
9,639
kWh
-
-
kW-months/year
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$426
Cost:
$590
$426 9,953 - - $426
9,953
kWh
-
-
kW-months/year
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,616
Cost:
$700
$1,616 20,982 - - $1,616
20,982
kWh
-
-
kW-months/year
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$96
Cost:
$528
$96 1,219 - - $96
1,219
kWh
-
-
kW-months/year
07: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$933
Cost:
-
$933 12,118 - - $933
12,118
kWh
-
-
kW-months/year
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$155
Cost:
$320
$155 2,016 - - $155
2,016
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$20,056
Cost:
$86,911
$20,054 264,762 $2 1,100 $20,054
264,762
kWh
$2
1,100
kW-months/year
TOTAL IMPLEMENTED Savings:
$19,314
Cost:
$86,911
$19,312 255,123 $2 1,100 $19,312
255,123
kWh
$2
1,100
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand