Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2008
Principal Product bricks
NAICS 327120 - Clay Building Material and Refractories Manufacturing
SIC 3251 - Brick And Structural Clay Tile
Sales $10,000,000-$50,000,000
# of Employees 79
Plant Area (Sq.Ft.) 250,000
Annual Production 118,000,000 Pieces
Production Hrs. Annual 1,986
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $577,530 9,164,168 kWh $0.06
Natural Gas $3,101,028 361,040 MMBtu $8.59
TOTAL ENERGY COSTS $3,678,558
RECOMMENDED SAVINGS* $231,542 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,845
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.1114 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE Savings:
$204,109
Cost:
$300,000
- - $204,109 23,706 -
-
kWh
$204,109
23,706
MMBtu
02: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$12,433
Cost:
$2,976
- - $12,433 1,444 -
-
kWh
$12,433
1,444
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,260
Cost:
$33,777
$4,260 67,597 - - $4,260
67,597
kWh
-
-
MMBtu
04: 2.7134 USE PHOTOCELL CONTROLS Savings:
$3,768
Cost:
$1,894
$3,768 59,792 - - $3,768
59,792
kWh
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$994
Cost:
$10,283
$994 15,780 - - $994
15,780
kWh
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$186
Cost:
$300
$186 2,958 - - $186
2,958
kWh
-
-
MMBtu
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,127
Cost:
-
$2,127 33,757 - - $2,127
33,757
kWh
-
-
MMBtu
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,161
Cost:
$3,000
$1,161 18,422 - - $1,161
18,422
kWh
-
-
MMBtu
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,504
Cost:
$1,845
$2,504 39,745 - - $2,504
39,745
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$231,542
Cost:
$354,075
$15,000 238,051 $216,542 25,150 $15,000
238,051
kWh
$216,542
25,150
MMBtu
TOTAL IMPLEMENTED Savings:
$4,845
Cost:
$15,428
$4,845 76,905 - - $4,845
76,905
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas