Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Alabama |
---|---|
Assessment Year | 2008 |
Principal Product | Latex Gloves |
NAICS | 339113 - Surgical Appliance and Supplies Manufacturing |
SIC | 3069 - Fabricated Rubber Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 269 |
Plant Area (Sq.Ft.) | 180,000 |
Annual Production | 500,000,000 Pieces |
Production Hrs. Annual | 8,400 |
Location (State) | AL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $366,957 | 6,983,000 | kWh | $0.05 |
Electricity Demand | $56,859 | 11,937 | kW-months/year | $4.76 |
Electricity Fees | $24,000 | - | $ | - |
Natural Gas | $1,682,412 | 194,917 | MMBtu | $8.63 |
TOTAL ENERGY COSTS | $2,130,228 | |||
RECOMMENDED SAVINGS* | $191,879 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $20,370 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $6,342 Cost: - |
$5,586 | 107,729 | $756 | 163 | - | - |
$5,586 107,729 kWh |
$756 163 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,878 Cost: $1,500 |
$1,878 | 32,169 | - | - | - | - |
$1,878 32,169 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $6,199 Cost: $14,155 |
$5,903 | 105,352 | $296 | 155 | - | - |
$5,903 105,352 kWh |
$296 155 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7122 DISCONNECT BALLASTS |
Savings: $1,392 Cost: $243 |
$1,226 | 23,657 | $166 | 35 | - | - |
$1,226 23,657 kWh |
$166 35 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $6,203 Cost: $300 |
- | - | - | - | $6,203 | 739 |
- - kWh |
- - kW-months/year |
$6,203 739 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $4,555 Cost: $2,415 |
- | - | - | - | $4,555 | 543 |
- - kWh |
- - kW-months/year |
$4,555 543 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2425 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER |
Savings: $98,000 Cost: $126,000 |
- | - | - | - | $98,000 | 11,700 |
- - kWh |
- - kW-months/year |
$98,000 11,700 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT |
Savings: $24,566 Cost: $23,000 |
- | - | - | - | $24,566 | 2,928 |
- - kWh |
- - kW-months/year |
$24,566 2,928 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $42,744 Cost: $45,700 |
- | - | - | - | $42,744 | 5,094 |
- - kWh |
- - kW-months/year |
$42,744 5,094 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $191,879 Cost: $213,313 |
$14,593 | 268,907 | $1,218 | 353 | $176,068 | 21,004 | $14,593 268,907 kWh |
$1,218 353 kW-months/year |
$176,068 21,004 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $20,370 Cost: $4,458 |
$8,690 | 163,555 | $922 | 198 | $10,758 | 1,282 | $8,690 163,555 kWh |
$922 198 kW-months/year |
$10,758 1,282 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |