IAC Assessment: UA0030
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UA0030
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2009
Principal Product molded parts
NAICS 334412 - Bare Printed Circuit Board Manufacturing
SIC 3672 - Printed Circuit Boards
Sales $10,000,000-$50,000,000
# of Employees 253
Plant Area (Sq.Ft.) 185,000
Annual Production 7,000,000 Pieces
Production Hrs. Annual 6,000
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $504,610 7,501,901 kWh $0.07
Electricity Demand $76,018 18,510 kW-months/year $4.11
Natural Gas $49,782 3,177 MMBtu $15.67
TOTAL ENERGY COSTS $649,691
RECOMMENDED SAVINGS* $43,848 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $41,362
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,479
Cost:
-
$2,118 44,618 $361 88 - - $2,118
44,618
kWh
$361
88
kW-months/year
-
-
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,368
Cost:
$1,500
$4,615 97,243 $753 184 - - $4,615
97,243
kWh
$753
184
kW-months/year
-
-
MMBtu
03: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$2,426
Cost:
$3,200
- - - - $2,426 161 -
-
kWh
-
-
kW-months/year
$2,426
161
MMBtu
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$60
Cost:
$66
- - - - $60 4 -
-
kWh
-
-
kW-months/year
$60
4
MMBtu
05: 2.2625 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE Savings:
$174
Cost:
-
$174 3,665 - - - - $174
3,665
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$29,168
Cost:
$80,743
$24,252 511,005 $4,916 1,197 - - $24,252
511,005
kWh
$4,916
1,197
kW-months/year
-
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,173
Cost:
$14,708
$3,203 67,486 $970 232 - - $3,203
67,486
kWh
$970
232
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$43,848
Cost:
$100,217
$34,362 724,017 $7,000 1,701 $2,486 165 $34,362
724,017
kWh
$7,000
1,701
kW-months/year
$2,486
165
MMBtu
TOTAL IMPLEMENTED Savings:
$41,362
Cost:
$96,951
$34,362 724,017 $7,000 1,701 - - $34,362
724,017
kWh
$7,000
1,701
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas