IAC Assessment: UA0041
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UA0041
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2010
Principal Product Parts for military tracked vehicles
NAICS 336992 - Military Armored Vehicle, Tank, and Tank Component Manufacturing
SIC 3711 - Motor Vehicles And Car Bodies
Sales $50,000,000-$100,000,000
# of Employees 350
Plant Area (Sq.Ft.) 280,000
Annual Production 485,000 Pieces
Production Hrs. Annual 6,000
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,759,622 24,541,634 kWh $0.07
Electricity Fees $(-36,372) - $ -
Natural Gas $951,340 84,235 MMBtu $11.29
TOTAL ENERGY COSTS $2,674,590
RECOMMENDED SAVINGS* $400,890 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $360,880
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$55,100
Cost:
$119,700
$55,100 784,685 - - $55,100
784,685
kWh
-
-
MMBtu
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,630
Cost:
$380
$2,630 37,465 - - $2,630
37,465
kWh
-
-
MMBtu
03: 2.1135 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY Savings:
$5,320
Cost:
$2,520
- - $5,320 471 -
-
kWh
$5,320
471
MMBtu
04: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$216,130
Cost:
-
- - $216,130 19,137 -
-
kWh
$216,130
19,137
MMBtu
05: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$76,495
Cost:
-
- - $76,495 6,773 -
-
kWh
$76,495
6,773
MMBtu
06: 2.2425 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER Savings:
$21,020
Cost:
$19,015
- - $21,020 1,862 -
-
kWh
$21,020
1,862
MMBtu
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,020
Cost:
$2,450
- - $1,020 121 -
-
kWh
$1,020
121
MMBtu
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,050
Cost:
$2
$1,050 14,890 - - $1,050
14,890
kWh
-
-
MMBtu
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$13,310
Cost:
$22,000
$13,310 189,570 - - $13,310
189,570
kWh
-
-
MMBtu
10: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,050
Cost:
$7
$3,050 43,470 - - $3,050
43,470
kWh
-
-
MMBtu
11: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$5,765
Cost:
$675
$5,765 88,935 - - $5,765
88,935
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$400,890
Cost:
$166,749
$80,905 1,159,015 $319,985 28,364 $80,905
1,159,015
kWh
$319,985
28,364
MMBtu
TOTAL IMPLEMENTED Savings:
$360,880
Cost:
$125,347
$61,915 888,510 $298,965 26,502 $61,915
888,510
kWh
$298,965
26,502
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas