Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Alabama |
---|---|
Assessment Year | 2012 |
Principal Product | Truck Seats |
NAICS | 336360 - Motor Vehicle Seating and Interior Trim Manufacturing |
SIC | 2531 - Public Building & Related Furniture |
Sales | $50,000,000-$100,000,000 |
# of Employees | 200 |
Plant Area (Sq.Ft.) | 187,000 |
Annual Production | 187,500 Pieces |
Production Hrs. Annual | 3,366 |
Location (State) | AL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $38,014 | 586,762 | kWh | $0.06 |
Electricity Fees | $34,674 | - | $ | - |
Natural Gas | $119,042 | 11,905 | MMBtu | $10.00 |
Other Energy | $182,619 | 10,632 | MMBtu | $17.18 |
TOTAL ENERGY COSTS | $374,349 | |||
RECOMMENDED SAVINGS* | $48,817 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $29,582 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Fees | Natural Gas | Administrative Changes | Electricity Usage | Electricity Fees | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $20,086 Cost: $29,396 |
$19,580 | 302,213 | $506 | - | - | - | - | - |
$19,580 302,213 kWh |
$506 - $ |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1114 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE |
Savings: $7,370 Cost: $1,353 |
- | - | - | - | $7,370 | 737 | - | - |
- - kWh |
- - $ |
$7,370 737 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $7,367 Cost: $2,548 |
$7,182 | 110,845 | $185 | - | - | - | - | - |
$7,182 110,845 kWh |
$185 - $ |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,694 Cost: $800 |
$3,602 | 55,594 | $92 | - | - | - | - | - |
$3,602 55,594 kWh |
$92 - $ |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,645 Cost: $2,200 |
$1,604 | 24,763 | $41 | - | - | - | - | - |
$1,604 24,763 kWh |
$41 - $ |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $481 Cost: $613 |
$469 | 7,232 | $12 | - | - | - | - | - |
$469 7,232 kWh |
$12 - $ |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $8,174 Cost: $30,000 |
- | - | - | - | $7,860 | 786 | $314 | - |
- - kWh |
- - $ |
$7,860 786 MMBtu |
$314 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $48,817 Cost: $66,910 |
$32,437 | 500,647 | $836 | - | $15,230 | 1,523 | $314 | - | $32,437 500,647 kWh |
$836 - $ |
$15,230 1,523 MMBtu |
$314 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $29,582 Cost: $33,562 |
$21,653 | 334,208 | $559 | - | $7,370 | 737 | - | - | $21,653 334,208 kWh |
$559 - $ |
$7,370 737 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Fees | Natural Gas | Administrative Changes | Electricity Usage | Electricity Fees | Natural Gas | Administrative Changes |