Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2014
Principal Product Railroad Ties
NAICS 321114 - Wood Preservation
SIC 2491 - Wood Preserving
Sales $50,000,000-$100,000,000
# of Employees 80
Plant Area (Sq.Ft.) 200,000
Annual Production 1,200,000 Pieces
Production Hrs. Annual 2,550
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $299,499 4,284,595 kWh $0.07
Electricity Fees $11,909 - $ -
Wood $148,000 77,969 MMBtu $1.90
TOTAL ENERGY COSTS $459,408
RECOMMENDED SAVINGS* $190,836 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,170
#|Description Savings
Cost
Status Electricity Usage Wood Electricity Usage Wood
$ kWh $ MMBtu
01: 4.132 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST Savings:
$125,709
Cost:
$180,000
- - $125,709 67,695 -
-
kWh
$125,709
67,695
MMBtu
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$24,552
Cost:
$12,050
- - $24,552 12,922 -
-
kWh
$24,552
12,922
MMBtu
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$13,032
Cost:
$35,000
- - $13,032 6,859 -
-
kWh
$13,032
6,859
MMBtu
04: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$11,022
Cost:
$7,500
- - $11,022 5,801 -
-
kWh
$11,022
5,801
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$10,193
Cost:
$6,764
$10,193 130,995 - - $10,193
130,995
kWh
-
-
MMBtu
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,565
Cost:
$6,495
$3,565 48,254 - - $3,565
48,254
kWh
-
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,158
Cost:
$7,334
$2,158 29,205 - - $2,158
29,205
kWh
-
-
MMBtu
08: 2.7134 USE PHOTOCELL CONTROLS Savings:
$605
Cost:
$1,725
$605 8,193 - - $605
8,193
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$190,836
Cost:
$256,868
$16,521 216,647 $174,315 93,277 $16,521
216,647
kWh
$174,315
93,277
MMBtu
TOTAL IMPLEMENTED Savings:
$4,170
Cost:
$8,220
$4,170 56,447 - - $4,170
56,447
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Wood Electricity Usage Wood