IAC Assessment: UA0142
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2015
Principal Product lumber
NAICS 321113 - Sawmills
SIC 2421 - Sawmills And Planing Mills, General
Sales $10,000,000-$50,000,000
# of Employees 55
Plant Area (Sq.Ft.) 600,000
Annual Production 28,000,000 Thousand Feet
Production Hrs. Annual 2,250
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $243,835 3,190,703 kWh $0.08
Electricity Demand $171,585 15,759 kW-months/year $10.89
Electricity Fees $30,619 - $ -
Wood $280,000 151,900 MMBtu $1.84
TOTAL ENERGY COSTS $726,039
RECOMMENDED SAVINGS* $153,604 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,671
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Wood Electricity Usage Electricity Demand Electricity Fees Wood
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$80,461
Cost:
$50,000
- - - - - - $80,461 43,729 -
-
kWh
-
-
kW-months/year
-
-
$
$80,461
43,729
MMBtu
02: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$42,051
Cost:
$9,539
- - - - - - $42,051 22,854 -
-
kWh
-
-
kW-months/year
-
-
$
$42,051
22,854
MMBtu
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,593
Cost:
$1,295
- - - - - - $1,593 866 -
-
kWh
-
-
kW-months/year
-
-
$
$1,593
866
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$17,671
Cost:
$26,729
$11,592 151,688 $5,106 469 $973 - - - $11,592
151,688
kWh
$5,106
469
kW-months/year
$973
-
$
-
-
MMBtu
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$332
Cost:
$411
$314 4,104 - - $18 - - - $314
4,104
kWh
-
-
kW-months/year
$18
-
$
-
-
MMBtu
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,421
Cost:
$800
$1,195 15,642 $2,983 274 $243 - - - $1,195
15,642
kWh
$2,983
274
kW-months/year
$243
-
$
-
-
MMBtu
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,977
Cost:
$2,995
$1,134 14,844 $2,624 241 $219 - - - $1,134
14,844
kWh
$2,624
241
kW-months/year
$219
-
$
-
-
MMBtu
08: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$600
Cost:
$500
$382 5,000 $185 17 $33 - - - $382
5,000
kWh
$185
17
kW-months/year
$33
-
$
-
-
MMBtu
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,150
Cost:
$2,880
$2,032 26,585 - - $118 - - - $2,032
26,585
kWh
-
-
kW-months/year
$118
-
$
-
-
MMBtu
10: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$348
Cost:
-
$329 4,302 - - $19 - - - $329
4,302
kWh
-
-
kW-months/year
$19
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$153,604
Cost:
$95,149
$16,978 222,165 $10,898 1,001 $1,623 - $124,105 67,449 $16,978
222,165
kWh
$10,898
1,001
kW-months/year
$1,623
-
$
$124,105
67,449
MMBtu
TOTAL IMPLEMENTED Savings:
$10,671
Cost:
$5,501
$2,972 38,892 $5,607 515 $499 - $1,593 866 $2,972
38,892
kWh
$5,607
515
kW-months/year
$499
-
$
$1,593
866
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Wood Electricity Usage Electricity Demand Electricity Fees Wood