Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Alabama |
---|---|
Assessment Year | 2016 |
Principal Product | Medium Density Fiberboard |
NAICS | 321219 - Reconstituted Wood Product Manufacturing |
SIC | 2493 - Reconstituted Wood Products |
Sales | $10,000,000-$50,000,000 |
# of Employees | 110 |
Plant Area (Sq.Ft.) | 43,600 |
Annual Production | 50,000 Tons |
Production Hrs. Annual | 8,568 |
Location (State) | AL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $5,364,753 | 107,812,560 | kWh | $0.05 |
Wood | $1,222,822 | 698,755 | MMBtu | $1.75 |
TOTAL ENERGY COSTS | $6,587,575 | |||
RECOMMENDED SAVINGS* | $425,681 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $104,799 |
#|Description |
Savings Cost |
Status | Electricity Usage | Wood | Electricity Usage | Wood | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $221,404 Cost: $94,081 |
$5,589 | 112,315 | $215,815 | 123,323 |
$5,589 112,315 kWh |
$215,815 123,323 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM |
Savings: $85,894 Cost: - |
- | - | $85,894 | 49,083 |
- - kWh |
$85,894 49,083 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $83,969 Cost: $169,192 |
$83,969 | 1,687,477 | - | - |
$83,969 1,687,477 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7134 USE PHOTOCELL CONTROLS |
Savings: $3,368 Cost: $1,162 |
$3,368 | 67,698 | - | - |
$3,368 67,698 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $12,685 Cost: $1,300 |
$12,685 | 254,917 | - | - |
$12,685 254,917 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $12,141 Cost: $700 |
$12,141 | 243,982 | - | - |
$12,141 243,982 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $6,220 Cost: $2,995 |
$6,220 | 124,990 | - | - |
$6,220 124,990 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $425,681 Cost: $269,430 |
$123,972 | 2,491,379 | $301,709 | 172,406 | $123,972 2,491,379 kWh |
$301,709 172,406 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $104,799 Cost: $4,295 |
$18,905 | 379,907 | $85,894 | 49,083 | $18,905 379,907 kWh |
$85,894 49,083 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Wood | Electricity Usage | Wood |