IAC logo
IAC Assessment: UA0205
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UA0205
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2019
Principal Product Fresh Water
NAICS 221310 - Water Supply and Irrigation Systems
SIC 4941 - Water Supply
Sales $10,000,000-$50,000,000
# of Employees 9
Plant Area (Sq.Ft.) 311,850
Annual Production 1,500,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $286,188 2,735,880 kWh $0.10
Electricity Demand $18,699 3,945 kW-months/year $4.74
Electricity Fees $(-4,122) - $ -
TOTAL ENERGY COSTS $300,765
RECOMMENDED SAVINGS* $73,098 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $980
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$700
Cost:
$1,908
$661 6,835 - - $39 - $661
6,835
kWh
-
-
kW-months/year
$39
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$51,026
Cost:
$98,308
$47,781 441,822 $7,034 1,484 $(-3,789) - $47,781
441,822
kWh
$7,034
1,484
kW-months/year
$(-3,789)
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$13,422
Cost:
$18,747
$10,839 98,217 $3,873 817 $(-1,290) - $10,839
98,217
kWh
$3,873
817
kW-months/year
$(-1,290)
-
$
04: 4.454 MODIFY STARTUP/SHUTDOWN TIMES Savings:
$280
Cost:
-
- - - - $280 - -
-
kWh
-
-
kW-months/year
$280
-
$
05: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$7,670
Cost:
$1,600
$7,247 74,882 - - $423 - $7,247
74,882
kWh
-
-
kW-months/year
$423
-
$
TOTAL RECOMMENDED Savings:
$73,098
Cost:
$120,563
$66,528 621,756 $10,907 2,301 $(-4,337) - $66,528
621,756
kWh
$10,907
2,301
kW-months/year
$(-4,337)
-
$
TOTAL IMPLEMENTED Savings:
$980
Cost:
$1,908
$661 6,835 - - $319 - $661
6,835
kWh
-
-
kW-months/year
$319
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees