IAC Assessment: UA0209
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UA0209
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2019
Principal Product Iron and Zinc Oxides
NAICS 331492 - Secondary Smelting, Refining, and Alloying of Nonferrous Metal (except Copper and Aluminum)
SIC 3341 - Secondary Nonferrous Metals
Sales $100,000,000-$500,000,000
# of Employees 136
Plant Area (Sq.Ft.) 560,137
Annual Production 326,000 Tons
Production Hrs. Annual 8,760
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,456,651 22,688,845 kWh $0.06
Electricity Fees $124,047 - $ -
Natural Gas $1,220,399 678,800 MMBtu $1.80
TOTAL ENERGY COSTS $2,801,097
RECOMMENDED SAVINGS* $134,535 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $96,403
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Electricity Usage Electricity Fees
$ kWh $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,815
Cost:
$10,528
$5,535 86,217 $280 - $5,535
86,217
kWh
$280
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$17,697
Cost:
$3,007
$16,845 262,318 $852 - $16,845
262,318
kWh
$852
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$36,956
Cost:
$100
$35,176 547,906 $1,780 - $35,176
547,906
kWh
$1,780
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$72,891
Cost:
$2,850
$69,380 1,080,689 $3,511 - $69,380
1,080,689
kWh
$3,511
-
$
05: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$1,176
Cost:
$1,200
$1,119 17,427 $57 - $1,119
17,427
kWh
$57
-
$
TOTAL RECOMMENDED Savings:
$134,535
Cost:
$17,685
$128,055 1,994,557 $6,480 - $128,055
1,994,557
kWh
$6,480
-
$
TOTAL IMPLEMENTED Savings:
$96,403
Cost:
$16,385
$91,760 1,429,224 $4,643 - $91,760
1,429,224
kWh
$4,643
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Electricity Fees Electricity Usage Electricity Fees