IAC logo
IAC Assessment: UA0228
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UA0228
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2020
Principal Product Wooden Stair Parts
NAICS 321918 - Other Millwork (including Flooring)
SIC 2431 - Millwork
Sales $5,000,000-$10,000,000
# of Employees 40
Plant Area (Sq.Ft.) 300,000
Annual Production 1,000,000 Units
Production Hrs. Annual 2,210
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $176,813 1,304,579 kWh $0.14
Electricity Fees $12,863 - $ -
TOTAL ENERGY COSTS $189,676
RECOMMENDED SAVINGS* $16,381 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Administrative Changes Electricity Usage Electricity Fees Administrative Changes
$ kWh $ $ $ $
01: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$8,116
Cost:
$100
- - $515 - $7,601 - -
-
kWh
$515
-
$
$7,601
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,664
Cost:
$11,337
$6,241 46,050 $423 - - - $6,241
46,050
kWh
$423
-
$
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,337
Cost:
$1,553
$1,252 9,239 $85 - - - $1,252
9,239
kWh
$85
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$164
Cost:
$419
$154 1,135 $10 - - - $154
1,135
kWh
$10
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$100
Cost:
$50
$94 693 $6 - - - $94
693
kWh
$6
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$16,381
Cost:
$13,459
$7,741 57,117 $1,039 - $7,601 - $7,741
57,117
kWh
$1,039
-
$
$7,601
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
$
-
-
$
Savings
Cost
$ kWh $ $ $ $
Electricity Usage Electricity Fees Administrative Changes Electricity Usage Electricity Fees Administrative Changes