IAC Assessment: UA0271
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UA0271
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2023
Principal Product Medical Instruments
NAICS 339112 - Surgical and Medical Instrument Manufacturing
SIC 3841 - Surgical And Medical Instruments
Sales $100,000,000-$500,000,000
# of Employees 300
Plant Area (Sq.Ft.) 166,500
Annual Production 150,000 Units
Production Hrs. Annual 6,240
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $732,243 4,357,866 kWh $0.17
Electricity Demand $55,684 11,748 kW-months/year $4.74
Electricity Fees $24,710 - $ -
Natural Gas $5,887 326 MMBtu $18.06
TOTAL ENERGY COSTS $818,524
RECOMMENDED SAVINGS* $90,725 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$925
Cost:
$377
$897 5,338 - - $28 - - - $897
5,338
kWh
-
-
kW-months/year
$28
-
$
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$16,935
Cost:
$24,359
$15,491 92,192 $929 196 $515 - - - $15,491
92,192
kWh
$929
196
kW-months/year
$515
-
$
-
-
MMBtu
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$66,296
Cost:
$2,275
$62,615 372,711 - - $1,966 - $1,715 95 $62,615
372,711
kWh
-
-
kW-months/year
$1,966
-
$
$1,715
95
MMBtu
04: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$6,447
Cost:
$13,906
$6,251 37,205 - - $196 - - - $6,251
37,205
kWh
-
-
kW-months/year
$196
-
$
-
-
MMBtu
05: 2.1121 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING Savings:
$122
Cost:
$65
$118 701 - - $4 - - - $118
701
kWh
-
-
kW-months/year
$4
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$90,725
Cost:
$40,982
$85,372 508,147 $929 196 $2,709 - $1,715 95 $85,372
508,147
kWh
$929
196
kW-months/year
$2,709
-
$
$1,715
95
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas