IAC Assessment: UA0276
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UA0276
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2023
Principal Product Orthopedic Instruments and Implants
NAICS 339112 - Surgical and Medical Instrument Manufacturing
SIC 3599 - Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 234
Plant Area (Sq.Ft.) 104,000
Annual Production 332,375 Units
Production Hrs. Annual 6,120
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $471,127 6,026,700 kWh $0.08
Electricity Demand $157,980 11,711 kW-months/year $13.49
Electricity Fees $(-48,962) - $ -
Natural Gas $3,045 2,022 MMBtu $1.51
TOTAL ENERGY COSTS $583,190
RECOMMENDED SAVINGS* $54,071 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $46,502
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$23,109
Cost:
$57,867
$20,014 255,938 $5,045 374 $(-1,950) - $20,014
255,938
kWh
$5,045
374
kW-months/year
$(-1,950)
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$10,633
Cost:
$8,591
$9,490 121,360 $2,040 151 $(-897) - $9,490
121,360
kWh
$2,040
151
kW-months/year
$(-897)
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,956
Cost:
$1,000
$5,390 68,920 $1,068 79 $(-502) - $5,390
68,920
kWh
$1,068
79
kW-months/year
$(-502)
-
$
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$12,760
Cost:
$35,064
$10,343 132,264 $3,494 259 $(-1,077) - $10,343
132,264
kWh
$3,494
259
kW-months/year
$(-1,077)
-
$
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,613
Cost:
$1,169
$1,749 22,364 - - $(-136) - $1,749
22,364
kWh
-
-
kW-months/year
$(-136)
-
$
TOTAL RECOMMENDED Savings:
$54,071
Cost:
$103,691
$46,986 600,846 $11,647 863 $(-4,562) - $46,986
600,846
kWh
$11,647
863
kW-months/year
$(-4,562)
-
$
TOTAL IMPLEMENTED Savings:
$46,502
Cost:
$101,522
$39,847 509,562 $10,579 784 $(-3,924) - $39,847
509,562
kWh
$10,579
784
kW-months/year
$(-3,924)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees