IAC logo
IAC Assessment: UA3028
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UA3028
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2013
Principal Product Floor Coverings
NAICS 321918 - Other Millwork (including Flooring)
SIC 2426 - Hardwood Dimension & Flooring Mills
Sales $50,000,000-$100,000,000
# of Employees 175
Plant Area (Sq.Ft.) 400,000
Annual Production 36,000 Thousand Feet
Production Hrs. Annual 4,900
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $784,417 12,396,800 kWh $0.06
Electricity Demand $569,565 52,264 kW-months/year $10.90
Electricity Fees $(-135,873) - $ -
Natural Gas $87,079 18,973 MMBtu $4.59
TOTAL ENERGY COSTS $1,305,188
RECOMMENDED SAVINGS* $45,469 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $22,215
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$22,215
Cost:
$5,595
$24,794 391,809 - - $(-2,579) - $24,794
391,809
kWh
-
-
kW-months/year
$(-2,579)
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,021
Cost:
$6,562
$3,096 48,922 $1,374 126 $(-449) - $3,096
48,922
kWh
$1,374
126
kW-months/year
$(-449)
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,307
Cost:
$1,000
$2,565 40,534 - - $(-258) - $2,565
40,534
kWh
-
-
kW-months/year
$(-258)
-
$
04: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$16,926
Cost:
$2,300
- - $16,926 1,553 - - -
-
kWh
$16,926
1,553
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$45,469
Cost:
$15,457
$30,455 481,265 $18,300 1,679 $(-3,286) - $30,455
481,265
kWh
$18,300
1,679
kW-months/year
$(-3,286)
-
$
TOTAL IMPLEMENTED Savings:
$22,215
Cost:
$5,595
$24,794 391,809 - - $(-2,579) - $24,794
391,809
kWh
-
-
kW-months/year
$(-2,579)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees