IAC Assessment: UC2205
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UC2205
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Connecticut
Assessment Year 2022
Principal Product Wastewater treatment
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $10,000,000-$50,000,000
# of Employees 12
Plant Area (Sq.Ft.) 58,600
Annual Production 2,920,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $450,627 4,782,240 kWh $0.09
Electricity Demand $131,825 7,804 kW-months/year $16.89
Electricity Fees $13,065 - $ -
Natural Gas $37,272 3,911 MMBtu $9.53
TOTAL ENERGY COSTS $632,789
RECOMMENDED SAVINGS* $373,272 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $ $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,071
Cost:
$2,641
$947 10,050 $1,019 60 - - $44 - - - $61 - $947
10,050
kWh
$1,019
60
kW-months/year
-
-
$
$44
-
$
-
-
$
$61
-
$
02: 2.3192 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS Savings:
$19,018
Cost:
-
$1,332 14,138 $4,898 290 $21,750 - $(-8,962) - - - - - $1,332
14,138
kWh
$4,898
290
kW-months/year
$21,750
-
$
$(-8,962)
-
$
-
-
$
-
-
$
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$3,990
Cost:
$500
$3,085 32,754 $904 54 - - - - - - - - $3,085
32,754
kWh
$904
54
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
04: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$2,840
Cost:
$500
$2,283 24,235 $557 33 - - - - - - - - $2,283
24,235
kWh
$557
33
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
05: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$279,536
Cost:
$1,875,313
$222,382 2,360,744 $88,774 5,256 - - - - $(-31,620) - - - $222,382
2,360,744
kWh
$88,774
5,256
kW-months/year
-
-
$
-
-
$
$(-31,620)
-
$
-
-
$
06: 2.3141 USE BATTERY STORAGE FOR DEMAND CONTROL Savings:
$65,817
Cost:
$383,577
$(-9,233) (-98,013) $81,072 4,800 - - - - $(-6,022) - - - $(-9,233)
(-98,013)
kWh
$81,072
4,800
kW-months/year
-
-
$
-
-
$
$(-6,022)
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$373,272
Cost:
$2,262,531
$220,796 2,343,908 $177,224 10,493 $21,750 - $(-8,918) - $(-37,642) - $61 - $220,796
2,343,908
kWh
$177,224
10,493
kW-months/year
$21,750
-
$
$(-8,918)
-
$
$(-37,642)
-
$
$61
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Personnel Changes Administrative Changes Ancillary Material Cost