IAC logo
IAC Assessment: UC2316
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UC2316
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Connecticut
Assessment Year 2023
Principal Product Medical devices
NAICS 339112 - Surgical and Medical Instrument Manufacturing
SIC 3841 - Surgical And Medical Instruments
Sales $10,000,000-$50,000,000
# of Employees 460
Plant Area (Sq.Ft.) 385,000
Annual Production 2,500,000,000 Pieces
Production Hrs. Annual 8,760
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,574,836 35,935,625 kWh $0.07
Electricity Demand $1,015,900 59,122 kW-months/year $17.18
Electricity Fees $(-56,453) - $ -
Fuel Oil #2 $280,078 10,885 MMBtu $25.73
TOTAL ENERGY COSTS $3,814,361
RECOMMENDED SAVINGS* $1,881,119 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Fuel Oil #2 Ancillary Material Cost Electricity Usage Electricity Demand LPG Fuel Oil #2 Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$26,355
Cost:
$75
$19,842 276,734 $6,513 379 - - - - - - $19,842
276,734
kWh
$6,513
379
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
02: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$7,167
Cost:
$5,801
$5,396 75,252 $1,771 103 - - - - - - $5,396
75,252
kWh
$1,771
103
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
03: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$76,811
Cost:
$332,613
$(-432) (-6,018) $(-3,433) (-200) - - $93,326 3,627 $(-12,651) - $(-432)
(-6,018)
kWh
$(-3,433)
(-200)
kW-months/year
-
-
MMBtu
$93,326
3,627
MMBtu
$(-12,651)
-
$
04: 2.1222 INSTALL TURBULATORS Savings:
$13,337
Cost:
$10,920
- - - - - - $13,337 518 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$13,337
518
MMBtu
-
-
$
05: 2.1241 REDUCE EXCESSIVE BOILER BLOWDOWN Savings:
$2,801
Cost:
$12,000
- - - - - - $2,801 109 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,801
109
MMBtu
-
-
$
06: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL Savings:
$153,910
Cost:
$207,578
- - - - $(-126,168) (-10,885) $280,078 10,885 - - -
-
kWh
-
-
kW-months/year
$(-126,168)
(-10,885)
MMBtu
$280,078
10,885
MMBtu
-
-
$
07: 2.1224 REPLACE BOILER Savings:
$177,614
Cost:
$423,535
- - - - $(-102,464) (-8,841) $280,078 10,885 - - -
-
kWh
-
-
kW-months/year
$(-102,464)
(-8,841)
MMBtu
$280,078
10,885
MMBtu
-
-
$
08: 2.3413 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT Savings:
$22,194
Cost:
$134,412
$20,511 286,065 $1,683 98 - - - - - - $20,511
286,065
kWh
$1,683
98
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
09: 2.9121 INSTALL WIND POWERED ELECTRIC GENERATOR Savings:
$1,380,736
Cost:
$10,992,131
$1,380,736 19,257,128 - - - - - - - - $1,380,736
19,257,128
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
10: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$20,195
Cost:
$268,543
$20,195 281,653 - - - - - - - - $20,195
281,653
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$1,881,119
Cost:
$12,387,608
$1,446,247 20,170,814 $6,534 380 $(-228,632) (-19,726) $669,620 26,025 $(-12,651) - $1,446,247
20,170,814
kWh
$6,534
380
kW-months/year
$(-228,632)
(-19,726)
MMBtu
$669,620
26,025
MMBtu
$(-12,651)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
Electricity Usage Electricity Demand LPG Fuel Oil #2 Ancillary Material Cost Electricity Usage Electricity Demand LPG Fuel Oil #2 Ancillary Material Cost